Loading...
Mansions Phase 1-LR 980303 (4) ' Rone Engineers, Inc. _34 Goodnight Lane Tel. (972) 241-45 Rone ineers Datlas.~Forl Worlh Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-040 I Date of Observation 2/24/98 Report Date 03/03/98 I To Western Rim Services Location PAVING APPROACH EXIT LANE FROM COMPLEX TO COPPELL ROAD, 10' NORTH, 10' EAST FROM SOUTHWEST CORNER OF APPROACH Contractor Supplier LATTIMORE Plant 7 I Truck 449 Ticket 7047210 Time Sampled 1:15 Time Batched 12:45 Weather Condition PT CLOUDY Concrete Temperature (OF) 76 Ambient Temperature (°F) 80 Mix Number 42 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.0 ENTRAINED AIR (%) 5.6 Concrete Cylinder Test(s) I I I T°tal L°ad Ic°mpressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 12A 3 2/27 74000 2620 4000/28 DAYS B 7 3/03 C 28 3/24 D 28 3/24 E H Curing Method I Test Method I Standard 6" x12" I Engineer/TechnicianR. LOVELADY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, ~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic {1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The teat results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditiona over which we have no control. Our letters and reports are for the exclusive uae of the clients to whom they are addressed. c:\wpwin\reports\D7429.O40-ge~,ST March 3, 1998