Mobil Sta MacA-CS 900726July 26, 1990
Mr. Mastafa Setayesh
The Dimension Group, Inc.
3455 Highland Road, Suite 100
Dallas, TX 75228
Re: Mobile Station - Beltline Road at MacArthur Boulevard
Dear Mr. Setayesh.-
A final inspection of the above referenced project has been
completed and verified in accordance with the conditional
acceptance letter dated July 31, 1989.
As built drawings and the one-year maintenance bonds have been
received. Maturity on the bonds will be one year from the date
of this letter. (July 26, 1990.)
If I can be of further assistance, please let me know.
Thank you.
Construction Inspector
CLD/bd
xc: Jim Nelson, Mobil Oil Corp.
Tom Ashmore, RJK Construction
Per Birdsall, Street Superintendent
Howard Pafford, Water Superintendent
Dale Jackson, Building Official
M. Shohre Daneshmand, Acting City Engineer
MOBIL.CLD