Deforest Court-LR010821REPORT OF SOIL-LIME MIXTURE PULVERIZATION ~
ENGINEERING, ]NC.
8901 Carpenter Frwy,, Suite 100
Da]l~. Tex~ 75247
Date of Service: 08/28/01 Report No.: 94001501.0023
Client No.: 2696 Project No.: 94001501
Client: Excel Group, Inc. Project:
2639 Walnut Hill Ln #218 Texas
Dallas, TX 75229
Page No.: 1 c i
Contractor: Specification Requirements:
Test Location: Minimum Passing 1 1/2" Sieve: 100%
Minimum Passing #4 Sieve: 60%
NT C~O~)~_ J I~'
TEST 1-1/~' SIEVE #4 SIEVE
NO. LOCATION % PASSING '/o PASSING
1 Sta. 6+62, DeForest Court Road 100 68
2 Sta. 3+91, DeForest Court Road 100 72
3 Sta. 0+90, DeForest Court Road 100 71
Technician: R. Montgomery
( 1 ) Excel Group, Inc.
(1) City of Copp¢ll - Engr.
( 1 ) City of Coppell - Bldg. Insp.
Eric J. Cleveland, P. E.
Senior Project Engineer
309 This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, Inc.