Loading...
Nextel-CS 970306DRC DATE: CONTACT: DEVELOPMENT REVIEW COMMI ENGINEERING COMMENTS ~.11241~ New. el of Texas. Communlaaflo~s Am change from LI (Light Industrial) to L-$.U.P. ¢ 'EE esma. a zoning Special Use Permit), to allow the consOucfion of q 120' monopolt ~ t~e O) omni whi~ ante~ ~d amd al 200 squ~'~ foot equipment cabinet at the base of the monopole oz foot site, located approximately 1,350' west of State south of Sandy ~ Road, at the request of Nextel February 27, 1997 and March 6, 1997 Mike Martin, P.E., Assigant City Engineer (304-$~ COMMENT STATUS: a 2,$oo square Road and 1,819' of Texas, lnc. 1. The access road needs to be coordinated with the future alignment of All areas of the access easement on the west side should be dedicated the future extension of Northpoint Drive. 2. It appears as though the proposed alignment of the access road will conflicts which may require some cut and fill. Please provide construc Northpoint Drive. as right-of-way for have some grade :ion plans for road.