Mobil BL/DT-CS 861002 ~ppell, Texas 75019
214- 462- 0022
~~ The CityWith A Beautiful Future RECE,VEDpRo~RTY00T 0 6TAX ~J~DI¥
OctobeP 2. 29S6
Mobil Oil Company
~o:.c 290
DalLas. ~exas 752'2
~=*t':~=_~_ Road %orth."S~u~.h ~etween interstate ~5~ and Denton
U~ Road. ~ section c'= = -
~ ~ ..... e_tl~ne Road is schedul=~
~o~-d improvements by t}.~= CSty o_= Coppell 5n ~.}.~ comSng weeks.
A ~eneflt Assessment ~earfng wfli be held on
1986 at..?:30 ~:m~ in ~he City Ka"' Town ~=~-~-.~_. Furch__
±nfo~a+'on~_ concerning_ the -'-%-=.-~ H_-r!nG=~ is i!sted ~. ~i_~
_'ne Ci ? D tc
-' t. fans ~uild~ a 6-1ane road but assess the
T~llas County will fund tko r=~a'~ ccst - .... = ~v~ intends
-~ assess = max&mum front foot rate o= ~ '~^
ihe ~cccun~-o =and ~arc~is~ = of ian~ under= ';our cwne~sk±~
Acc~. Nc. ~'k~_ Loc !font ?eot
T'~/AL~ ~ FRONT FOOTAGe- ooo.~o^~' --
;~ S25C.56 ~er ft.
TOUAL ASSESSMENU = 55.7~~ ':- ; ~"
The ~ur~ose cf ~kls_='-b~ :c_ _- H~-ring=~ is for abutting prcpe~v
owners their abaci - ' agents and attorneys and in~eres~
}erscns o spe~k ~ Th~ amount assessed to each ~rc~ertv and
~he benefits to each pPoDer~y .r~.... the :ntended imDPovements.
Sincerely.
SVB Rea' Pro:arty_ . Servi~=~
3cnsult~~--..~ to ~he C:~v of
Compel'
P. O. Box 478
Coppell. Texas 75019
The City With A Beautiful Future 214. 462-0022
NOTICE OF PUBLIC HEARING
October 21, 1986
MEETING TIME: 7:30 P.M.
M__~EETING PLACE: City Hall Town Center
255 Parkway Boulevard
Notice is hereby given that the City Council of the City of
Coppell will hold a Public Hearing at 7:30 p.m. at the City
Hall (Coppell Town Center) at 255 Parkway Boulevard on the
21st day of October, 1986 as to the amount to be assessed
against each abutting property owner, railways, and street
railways, if any, or their agents or attorneys and to hear
all persons interested in said matter and as to the benefits
to said property by reason of said improvement or any other
matter or thing in connection therewith on the followinG
street:
Belt Line Road from approximately 600 feet North of
Interstate 635 to Belt Line Road East/West.
The cost of the improvements including contingencies is
$6.275 million, and the maximum assessment rate is $130.56
per front foot.
The street shall be paved from curb to curb with 9-Inch
thickness reinforced 3000-pounds per square inch concrete
pavement; with 12-inch cement stabilized base; with 6-inch
height integral curbs; with 6-inch thickness reinforced
concrete drive approaches; with 4-inch thickness reinforced
concrete sidewalks where specified; so that there shall be
two roadways each 34 feet in width separated by a variable
width median with left turn lanes where specified; and such
improvements shall include the construction of all necessary
storm drainage for the completion of this project.