Loading...
Minyard-CS 970618Mo ow CONSTRUCTION P.O. BOX 158 · LAVON, TEXAS75166 · (214) 843-3601 · 843-2681 * FAX843-0222 June 18, i. 997 City of Coppell Engineerin~ Dept. ' Mr. Larry Davis Dear Si r: In reference to Bore & encasement of Bethel Rd. at the blinyard'§-warehouse location. There was no pressure in]ection of water used and the gteel casing were placed immediately after boring. A depression was observed after a heavv rain near the south edge of asphalt paving near the ix:esterlv bore. Also, numerous sinking of pavement occured along bethel Rd. for a period of time. A sewer line was constructed by others in Bethel Rd. prior to the placement of Bore & Encasement by our firm. We have never had a roadwav failure caused bv placement of bores. Therefore Morrow Construction does not Feel liable for any damage to roadway surface. Respectfully, Kill Morrow Morrow Construction