Loading...
Minyard-CS 961126 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Minyard Addition, Lots 1 & 2. Block 1. Irtnal Plat. to allow the development of an extnmsion of the warehouse, as well as to accommodate the existing Minyard facility, located at the southwest comer of Bethel Road and Freeport Parkway, at the request of David Moak Surveyors, Inc. DRC DATE: November 26, 1996 and December 5, 1996 CONTACT: Mike Martin, E. L T., Assistant City Engineer 004-3679) COMMENT STATUS: RE VISED AFTER P-&Z 1. Show the new right-of-way line along Bethel Road with a heavier line. 2. It appears that a portion of Freeport Parkway encroaches on the northeast corner of this site. If so, adequate right-of-way should be provided to give a minimum of ten feet behind the back of curb.