Minyard-CS 961126 DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Minyard Addition, Lots 1 & 2. Block 1. Irtnal Plat. to allow the
development of an extnmsion of the warehouse, as well as to
accommodate the existing Minyard facility, located at the southwest
comer of Bethel Road and Freeport Parkway, at the request of David
Moak Surveyors, Inc.
DRC DATE: November 26, 1996 and December 5, 1996
CONTACT: Mike Martin, E. L T., Assistant City Engineer 004-3679)
COMMENT STATUS: RE VISED
AFTER P-&Z
1. Show the new right-of-way line along Bethel Road with a heavier line.
2. It appears that a portion of Freeport Parkway encroaches on the northeast corner of
this site. If so, adequate right-of-way should be provided to give a minimum of ten feet
behind the back of curb.