Minyard-CS 960419 :.~.:,,--~..,/ .~---'~//"/ .,' . i ~]z.._:_ P.O. Box 478
-- ' ' Coppell, Texas 75019
" -";~" The City With A Beautiful Future
214-462-0022
.~- .~,,' .~;
,f ::
April 19, 1996
Washington and Associates
Jacky Fluitt
500 Grapevine Hwy., Ste. 376
Hurst, TX 76054
RE: Minyards Expansion at Freeport and Bethel
Development Fee Assessment
Dear Mr. Fluitt:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Developmem Fee calculations for Minyards expansion at Freeport and Bethel.
As per Section 3 of the 1988 "Contract in Respect of Grant of Easements and Escrow Deposit"
between Minyards and the City of Coppell, a credit of $109,203.18 has been applied to the fee
assessments for the referenced project. A copy of the Engineer's estimate or contract for this
project will need to be provided to our department so the construction inspection fee can be verified
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Assistant City Manager/City Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official