Minyard-CS 960723 CITY OF COPPELL
DEVELOPMENT FEE SUMMARY SHEET
Project: Minyards Expansion Date: July 23, 1996
at Freeport and Bethel
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact * 15,975.00 -0-
Water Tap Inspection * 100.00 -0-
Water Meter (Domestic) * 1,575.00 -0-
Water Meter (Irrigation & Fire) * 3,833.18 -0-
Water Meter Deposit (Non-residential) * 30.00 -0-
Irrigation Meter Deposit * 70.00 -0-
Wastewater Impact * 11,250.00 -0-
Wastewater Tap Inspection * -0- -0-
Utility Final Inspection * 50.00 -0-
Park · -0- -0-
Roadway Impact 76,320.00 -0-
Street Light -0- -0-
(Fee @ $292.60 per light. Cannot be assessed until TU
Electric submits the lighting plan)
Street Sign * -0- -0-
Construction Inspection need submittal of -0-
(2 % of project cost due for private improvements) contracts
(4 % of project cost due for public improvements)
TOTAL $109,203.18
! '
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL ** -0-
· See Development Fee Work Sheet or Resolution No. 010996.3 of the Code of Ordinances to determine payment
due dates for individual fees.
· * Credit of $109,203.18 per section 3 of the 1988 "Contract in Respect of Grant of Easements and Escrow Deposit"
between Minyards and the City of Coppell.
,l
DEVEIDPMENT FEE WORK SHEET
RE: fv~',~./~rA ~ Date:
Water Impact:
Domestic Meters # I - ~- (inch) = ~5 ESU's
Irrigation Meters # I 2- (inch) = ~ ESU's
Fireline Meters # ~ !O (inch) = '2,5' ESU's
Total # ~fi;. 5' ESU's @ $450.00 ea = [ 6:q-/~.90
(100% due prior to Council approval of the final plaO
Water Tap Inspection:
Total # '2. Connections @ $50.00 ea =
(Single family due prior to issuance of building permit)
(All oth'er developments due prior to issuance of meter)
Water Meter (Domestic):
Total # | - 4- (inch) Domestic Meters @ i ~;-/~. ooea = I S-/5. OO
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter (irrigation/Fireline): Iq n'.q~
Total # I 2. (inch) Irrigation Meters @~ ea
Total # I IO .(inch) Fireline Meters @ '~b3"1,20 ea
(100% due prior to issuance of water meters)
Water Meter Deposit (Multi-family or Non-residential):
Total # I Meters @ $30.00 ea =
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit:
Total # 2. Meters @ $35.00 ea =
(100% due prior to issuance of water meters)
Wastewater Impact:
Total Domestic Meters ESU's - ~' @ $450.00 ea = I I ~,~O ,oo
(100% due prior to Council approval of the final plaO
Wastewater Tap Inspection:
Total # O Connections @ $50.00 ea =
(100% due prior to issuance of building permit)
Utility Final Inspection (all development):
Total # ] Lots @ $50.00 ea = ~'O .~O
(100% due prior to issuance of building permit)
Page 1 of 2
D~ ffRLOPMENT FEE WORK SHEET (cont)
RE: V¥, ~/~n rd 5 Date:
Park:
· Peliminary plat approval prior to June 23, 1992:
# Residential lots @ $150.00 ea =
# Units (multi-family) @ $75.00 ea =
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
~ Preliminary plat approval after June 23, 1992:
# Residential lots @ $350.00 ea =
# Units (multi-family) @ $350.00 ea = /~]
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
· Preliminary plat approval after October 26, 1993:
# Residential lots @ $1,285.00 ea =
# Units (multi-family) @ $1,285.00 ea = N]/~ ..
(100% paid prior to Council approval of final plat)
Roadway Impact: = -/t,, 39-0. OO
Separate fee calculations attached.
Street Lighting: =
Fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project.
Once plan is submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of project)
Street Signs: = gt ~ ~ _
Separate Street Sign Assessment form will be provided.
(100% due prior to final acceptance of project)
Construction Inspection: =
Copy of contract must be submitted for assessment
(2 % of project cost due for private improvements)
(4% of project cost due for public improvements)
Page 2 of 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Minyards Expansion (Freeport @ Bethal)
DATE: 7/23/96
ROADWAY IMPACT FEE:
9
Industrial
Land Use ** General Light Industrial
Building Size (Sq. Ft.) 240,000
Development Units ** 240
Vehicle Miles per Development Unit ** [ 1.06
Fee per Vehicle Mile [ $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $76,320.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)