Loading...
Minyard-CS 960723 CITY OF COPPELL DEVELOPMENT FEE SUMMARY SHEET Project: Minyards Expansion Date: July 23, 1996 at Freeport and Bethel TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact * 15,975.00 -0- Water Tap Inspection * 100.00 -0- Water Meter (Domestic) * 1,575.00 -0- Water Meter (Irrigation & Fire) * 3,833.18 -0- Water Meter Deposit (Non-residential) * 30.00 -0- Irrigation Meter Deposit * 70.00 -0- Wastewater Impact * 11,250.00 -0- Wastewater Tap Inspection * -0- -0- Utility Final Inspection * 50.00 -0- Park · -0- -0- Roadway Impact 76,320.00 -0- Street Light -0- -0- (Fee @ $292.60 per light. Cannot be assessed until TU Electric submits the lighting plan) Street Sign * -0- -0- Construction Inspection need submittal of -0- (2 % of project cost due for private improvements) contracts (4 % of project cost due for public improvements) TOTAL $109,203.18 ! ' TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL ** -0- · See Development Fee Work Sheet or Resolution No. 010996.3 of the Code of Ordinances to determine payment due dates for individual fees. · * Credit of $109,203.18 per section 3 of the 1988 "Contract in Respect of Grant of Easements and Escrow Deposit" between Minyards and the City of Coppell. ,l DEVEIDPMENT FEE WORK SHEET RE: fv~',~./~rA ~ Date: Water Impact: Domestic Meters # I - ~- (inch) = ~5 ESU's Irrigation Meters # I 2- (inch) = ~ ESU's Fireline Meters # ~ !O (inch) = '2,5' ESU's Total # ~fi;. 5' ESU's @ $450.00 ea = [ 6:q-/~.90 (100% due prior to Council approval of the final plaO Water Tap Inspection: Total # '2. Connections @ $50.00 ea = (Single family due prior to issuance of building permit) (All oth'er developments due prior to issuance of meter) Water Meter (Domestic): Total # | - 4- (inch) Domestic Meters @ i ~;-/~. ooea = I S-/5. OO (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter (irrigation/Fireline): Iq n'.q~ Total # I 2. (inch) Irrigation Meters @~ ea Total # I IO .(inch) Fireline Meters @ '~b3"1,20 ea (100% due prior to issuance of water meters) Water Meter Deposit (Multi-family or Non-residential): Total # I Meters @ $30.00 ea = (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit: Total # 2. Meters @ $35.00 ea = (100% due prior to issuance of water meters) Wastewater Impact: Total Domestic Meters ESU's - ~' @ $450.00 ea = I I ~,~O ,oo (100% due prior to Council approval of the final plaO Wastewater Tap Inspection: Total # O Connections @ $50.00 ea = (100% due prior to issuance of building permit) Utility Final Inspection (all development): Total # ] Lots @ $50.00 ea = ~'O .~O (100% due prior to issuance of building permit) Page 1 of 2 D~ ffRLOPMENT FEE WORK SHEET (cont) RE: V¥, ~/~n rd 5 Date: Park: · Peliminary plat approval prior to June 23, 1992: # Residential lots @ $150.00 ea = # Units (multi-family) @ $75.00 ea = (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) ~ Preliminary plat approval after June 23, 1992: # Residential lots @ $350.00 ea = # Units (multi-family) @ $350.00 ea = /~] (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) · Preliminary plat approval after October 26, 1993: # Residential lots @ $1,285.00 ea = # Units (multi-family) @ $1,285.00 ea = N]/~ .. (100% paid prior to Council approval of final plat) Roadway Impact: = -/t,, 39-0. OO Separate fee calculations attached. Street Lighting: = Fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of project) Street Signs: = gt ~ ~ _ Separate Street Sign Assessment form will be provided. (100% due prior to final acceptance of project) Construction Inspection: = Copy of contract must be submitted for assessment (2 % of project cost due for private improvements) (4% of project cost due for public improvements) Page 2 of 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Minyards Expansion (Freeport @ Bethal) DATE: 7/23/96 ROADWAY IMPACT FEE: 9 Industrial Land Use ** General Light Industrial Building Size (Sq. Ft.) 240,000 Development Units ** 240 Vehicle Miles per Development Unit ** [ 1.06 Fee per Vehicle Mile [ $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $76,320.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study)