Loading...
Northlake 635(6)-CS 970108From the desk of... Ken Griffin, P.E. Asst. City Manager City Engineer City of Coppe P.O. Box 474 P R E L I M I N ~Ft~ll, /',~ ,~OR"E V I E W ONLY (214)304-3679 / (Metro 471-2251) b VELOPMENT FEE TABLe; Project: Date: Northlake 635 Business Park Lot2, Block A (Vari. Lite Headquarters) 1/8/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $195.98 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,776.88 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $74,730.00 $74,730.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acce~:~nce of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fe.~., i ~OO. ta ,~ Jc.~' ~,.,,~..~ ~ o~oo- ~ ~su~~f~v~p~6ent~ontPacts' TOTAL TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $86,655.00 DI--VELOPMENT FEE WORKSHEI= r PROJECT: Northlake 635 Business Park Lot2, Block A (Vari-Lite Headquarters, DATE: 1/8/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter{s): 1 - 2 inch = 8 1 - 2 inch -- 8 I - 8 inch -- 2.5 Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. {Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: I Irrigation Meter{s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: I Fireline Meter(s) @ (100% due prior to issuance of water meters) $195.98 $2,580.90 Water Meter Deposit Fee (Domestic): Total #: 1 Meter{s) @ $30.00 ea. {100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ 950.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ 950.00 ea. {100% due prior to issuance of building permit) PRELIMINARY FOR Page I REVIEW ON i II ESU's ESU's ESU's ESU's 98,325.00 9150.00 9195.98 9195.98 90.00 92,580.90 $30.00 970.00 93,600.00 $50.00 $50.00 D.¢ELOPMENT FEE WORKSHE.~' Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat aPprOved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations} Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) FOR =' IEW ONLY Page 2 N/A N/A N/A N/A N/A N/A $74,730.00 Information not available at ~his time Information not available at this time ROAb v~AY IMPACT FEE CALCULA ~IONS PROJECT: DATE: Northlake 635 Business Park Lot 2, Block A (Vari-Lite Headquarters) 1/8/97 ROADWAY IMPACT FEE: Service Area * ** Use ** Buildln~ Size (ScI. Ft.) Development Units ** ;Vehicle Miles per Development Unit ** ~ee per Vehicle Mile *** ~oadway Impact Fee due -- (Development Units) x General 235,( 231 1.0 $30 (Vehicle Miles ]~er Development Unit) x (Fee per Vehicle Mile) = * (Figure 2 - Roadway Impact ** (Table 3 - Roadway Impact ] *** (Schedule 2, Page 3 - Roadw $74,730.00 Fee Study) ~ee Study) ay Impact Fee Study) PRELIMINARY FOR FiEVIEW OI , L'Y