Northlake 635(6)-CS 970108From the desk of...
Ken Griffin, P.E.
Asst. City Manager
City Engineer
City of Coppe
P.O. Box 474
P R E L I M I N ~Ft~ll, /',~ ,~OR"E V I E W ONLY
(214)304-3679 / (Metro 471-2251)
b VELOPMENT FEE TABLe;
Project:
Date:
Northlake 635 Business Park Lot2, Block A (Vari. Lite Headquarters)
1/8/97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $8,325.00 $8,325.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $195.98
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $2,776.88
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $70.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $3,600.00 $3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Buildin~ Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $74,730.00 $74,730.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acce~:~nce of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fe.~., i ~OO. ta ,~ Jc.~' ~,.,,~..~ ~ o~oo- ~ ~su~~f~v~p~6ent~ontPacts'
TOTAL
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $86,655.00
DI--VELOPMENT FEE WORKSHEI= r
PROJECT: Northlake 635 Business Park Lot2, Block A (Vari-Lite Headquarters,
DATE: 1/8/97
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter{s):
1 - 2 inch = 8
1 - 2 inch -- 8
I - 8 inch -- 2.5
Total #: 18.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
{Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $195.98
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: I Irrigation Meter{s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: I Fireline Meter(s) @
(100% due prior to issuance of water meters)
$195.98
$2,580.90
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter{s) @ $30.00 ea.
{100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ 950.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ 950.00 ea.
{100% due prior to issuance of building permit)
PRELIMINARY
FOR
Page I
REVIEW ON
i II
ESU's
ESU's
ESU's
ESU's
98,325.00
9150.00
9195.98
9195.98
90.00
92,580.90
$30.00
970.00
93,600.00
$50.00
$50.00
D.¢ELOPMENT FEE WORKSHE.~'
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat aPprOved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations}
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
FOR =' IEW ONLY
Page 2
N/A
N/A
N/A
N/A
N/A
N/A
$74,730.00
Information not
available at ~his time
Information not
available at this time
ROAb v~AY IMPACT FEE CALCULA ~IONS
PROJECT:
DATE:
Northlake 635 Business Park Lot 2, Block A (Vari-Lite Headquarters)
1/8/97
ROADWAY IMPACT FEE:
Service Area *
**
Use **
Buildln~ Size (ScI. Ft.)
Development Units **
;Vehicle Miles per Development Unit **
~ee per Vehicle Mile ***
~oadway Impact Fee due -- (Development Units) x
General
235,(
231
1.0
$30
(Vehicle Miles ]~er Development Unit) x (Fee per Vehicle Mile) =
* (Figure 2 - Roadway Impact
** (Table 3 - Roadway Impact ]
*** (Schedule 2, Page 3 - Roadw
$74,730.00
Fee Study)
~ee Study)
ay Impact Fee Study)
PRELIMINARY FOR FiEVIEW OI , L'Y