Loading...
Mansions Phase 1-LR 980220 Rone Engineers, Inc. ~ 1''~'; Goodnigl~t Lane Tel. (972) 2.,-.51- RoneEn ineers Dallas/Eon Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-034 Date of Observation 2/11198 Report Date 02120/98 To Western Rim Services Location PAVEMENT - 60' EAST THROUGH MAIN ENTRANCE AND 70' NORTH AT CENTER LINE Contractor Supplier LATTIMORE I Plant 7 I Truck 457 Ticket 7046633 I I Time Sampled 9:2.0 Time Belched 8:2.3 Weather Condition CLEAR Concrete Temperature (OF) 51 Ambient Temperature (°F) 42 Mix Number Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4.5 ENTRAINED AIR (%) 5.0 Concrete Cylinder Test(s) Specimen Age I Test Date I Total I-Dad Compressive No. (Days) I I (lbs.) Strength (psi) Strength Required (psi) 9A 7 2/1 8 69000 2440 3000/28 DAYS B 28 3/11 C 28 3/11 D H Curing Method I TestMethod Standard 6" x12" I Engineer/-I'echnicianR. CROWDER ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, ~. Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic LIMITATIONS: The teat results preaented herein were prepared baaed upon the apecific aamplea provided for tearing. We aasume no responaibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by peraons or conditions over which we have no control. Our lettera and reports are for the excluaive uae of the clients to whom they are addressed. c:\wpwin\repor~s\D7429-O34-Se\ST February 20, 1995