Mansions Phase 1-LR 980220 Rone Engineers, Inc. ~ 1''~'; Goodnigl~t Lane Tel. (972) 2.,-.51- RoneEn ineers
Dallas/Eon Worth Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-034 Date of Observation 2/11198 Report Date 02120/98
To Western Rim Services
Location PAVEMENT - 60' EAST THROUGH MAIN ENTRANCE AND 70' NORTH AT CENTER LINE
Contractor
Supplier LATTIMORE I Plant 7 I Truck 457 Ticket 7046633
I
I
Time Sampled 9:2.0 Time Belched 8:2.3 Weather Condition CLEAR
Concrete Temperature (OF) 51 Ambient Temperature (°F) 42 Mix Number
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4.5
ENTRAINED AIR (%) 5.0
Concrete Cylinder Test(s)
Specimen Age I Test Date I Total I-Dad Compressive
No. (Days) I I (lbs.) Strength (psi) Strength Required (psi)
9A 7 2/1 8 69000 2440 3000/28 DAYS
B 28 3/11
C 28 3/11
D H
Curing Method I TestMethod Standard 6" x12" I Engineer/-I'echnicianR. CROWDER
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Kevin Tucker, ~. Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
LIMITATIONS: The teat results preaented herein were prepared baaed upon the apecific aamplea provided for tearing. We aasume no
responaibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
peraons or conditions over which we have no control. Our lettera and reports are for the excluaive uae of the clients to whom they are
addressed.
c:\wpwin\repor~s\D7429-O34-Se\ST February 20, 1995