Loading...
Mansions Phase 1-LR 980219 (5) Rone Engineers, Inc. 1 ._34 Goodnight Lane Tel. (972) 241-451 ~ ineers Dal~as/Fo,1, Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-33 I Date of Observation 2/11/98 Report Date 02/19/98 I To Western Rim Services Location PAVEMENT - 40' NORTH AND 55' EST OF NORTH SIDE OF WEST METER VAULT Contractor Supplier LATTIMORE Plant 7 I Truck 612 Ticket 7046623 Time Sampled $:30 Time Batched 7:17 Weather Condition CLEAR Concrete Temperature (°F) 50 Ambient Temperature (°F) 45 Mix Number Mix Description Unit Weight Water Added NONE Physical Data ACTUAL S PE CIFI CATI O NS SLUMP (in.) 5.0 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 8A 7 2/1 8 72000 2550 3000/28 DAYS B 28 3/11 C 28 3/11 D H Curing Method I Test Method Standard 6" x 12" I Engineer/Technician R. CROWDER ASTM C 31I ASTM C 39 Area 28.27 sq. in. I Signature: Kevin Tucker, Supervisor, CMT ~ Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality Icomposition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the excluslve use of the clients to whom they ere addressed. c:\wpwin\reports~D7429-O33-98~ST February 19, 1998