Mansions Phase 1-LR 980217 ,one Engineers, Inc. 1. ~34 Goodnight Lane Tel. (972) 241-451, RoneEnaineers
Dallas/Fort Worth Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-028 Date of Observation 2/10/98 Report Date 02/17/98
To Western Rim Services
Location PAVEMENT AT MAIN ENTRANCE, 30' EAST AT CENTER LINE, SOUTH BOUND SIDE
Contractor
Supplier LATTIMORE I Plant 7 I Truck 757 Ticket 7046569
I
I
Time Sampled 8:00 Time Batched 7:22 Weather Condition CLEAR
Concrete Temperature (°F) 60 Ambient Temperature (°F) 50 Mix Number
Mix Description Unit Weight Water Added 5 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4.0
ENTRAINED AIR (%) 5.1
Concrete Cylinder Test(s)
I I IT°Ial L°ad c°mpressive
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
5A 7 2/1 7 78000 2760 3000/28 DAYS
B 28 3/10
C 28 3/1 0
D H
Curing Method I Test Method I Standard 6" x12" I Engineer/TechnicianR. CROWDER
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Kevin Tucker, Supervisor, CMT f
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
{1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-O28-98\ST February 17. 1998