Loading...
Mansions Phase 1-LR 980216 .one ~=ngineers, Inc. 1 4 Goodnigt3! Lane Tel. (97E) 241-45-. ineers Dallas.-'Fort Worth Dallas. Texas Metro (972) 263-1555 75229 i Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-024 I Date of Observation 2/04/98 Report Date 02/16/98 I To Western Rim Services Location WATER METER CAP, 5' WEST, 5' SOUTH FROM NORTHEAST CORNER OF METER CAP Contractor Supplier TXI Plant 41 I Truck 460 Ticket 972982 I Time Sampled 2:15 Time Batched 1:36 Weather Condition CLOUDY Concrete Temperature (°F) 72 Ambient Temperature {°F) 60 Mix Number 8274 Mix Description 6 SACKS ADMIX/AIA Unit Weight Water Added 5 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.0 Concrete Cylinder Test(s) I I IT°tal L°ad C°mpressive Specimen Age Test Date No. (Days} (lbs.) Strength (psi) Strength Required (psi) 4A 7 2/11 99000 3.500 3000/28 DAYS B 28 3/04 C 28 3/04 D H ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, ~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic LIMITATIONS: The test results presented herein were prepared baaed upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repo~a are for the exclusive uae of the clients to whom they ara addressed. c:\wpwin\raports\D7429-O24-98\ST February 16, 1998