Loading...
Mansions Phase 1-CS 991129 - Federal , Emer encv Mana emem ncv Washington, D.C. 20472" ........ N0V 2 9 1999 CERTIFIED MAIL IN R~PLY REPBR TO: RETURN ~CEI~ ~QUESTBD Case No.: ~-06-831P ~e Honorable Candy Shee~n Co~uni~: City of Coppell, Texas Mayor, City of Coppell Co~u~ No.: 480170 255 Parkway Boulevard Map Pane Affected: ~10 E Coppell, TX 7~019 Dear Mayor Sheehan: In a ~er of Map Revision dated 1uly 6, lOOO, you were notified of proposed modified flo~ elevation delerminalEm affecting ~e Flood I~urance Rale Map (FI~) and Flo~ I~urance Study (FIS) repo~ for ~e Ci~ of Cop~ll, Dall~ ~d Denton Co~ties, Text. ~ese dete~liom were for Denlon Creek ~om approx~aiely 3,2~ feet do~tre~ ~o just dowmire~ of S~le Highway 121. ~e ~0-day appeal peri~ ~at w~ ~tia~ on Au~t 20, 19~, when ~e Federal Emergency M~gement Agency (FEMA) published a notice of proposed base flood elevations (BFEs) in the O~e~ 's A~vocdte, h~ elapsed. FEMA received no valid requests for changes ~o ~e m~ified BFEs. ~erefore, ~e modified BFEs became effective on {uly 6, l~, remain valid and revise the FI~ and ~IS repo~ thai were in effec~ prior w lha~ date. The m~ificalio~ are pursuan~ to Section 206 of ~e Flood Disasier Protection Aa of 1~73 (~blic ~w 93-234) ~d ~e ~ accord~ce wi~ ~e Natio~l Fl~ I~ur~ Act of 1968, ~ ~ended (Tkle of ~e Housing and Urban Development Aa of 1968, ~blic ~w ~8), 42 U.S.C. 4~1~128, and 44 CFR Pan 65. ~e co~uni~ number(s) and sufFm c~e(s) are u~ffected by this revision. co~uni~ n~ber and appropriate suffix c~e as shown above will be used by ~e Naiional Flood I~ur~ce Protr~ (NFIP) for all flood i~urance policies ~d renewals issued Er your co~unRy. FEMA h~ develo~ cri~ria Er flo~plain ma~gemem as required under ihe above-mentioned Acls of 1~68 and 1~73. To continue participation in lhe NFIP, your co~uni~ musi use ~e modified BFEs car~ out ~e floodplain manatemem re, Iai(om for ~e NFIP. ~e modified B~Es will also be used calculate ~e appropfiale flo~ ~ce premim rates Er all new build,is ~ ~eir conien~ ~d Er second layer of i~urance on existing buildints and ~eir con~enls. If you have ~y quesfio~ retarding ~e necessa~ flo~plain management measures Er your co~unky or ~e NFIP in general, we urge you ~o con,ct ~e Direcwr, Mitigation Division of FEMA in Denton, Text, at (~0) 898-5127. If you ~ve ~y quesfio~ conce~g ~e pro~s~ m~ified BFEs or mapping issues ~ tenetS, ple~e conga Mr. Al~ {o~on of our s~ff in W~hinglon, DC, eider by telephone (202) ~3403 or by facs~ile al (202) Sincerely, Maahew B. Miller, P.E., Chief Hazards Study Brach Mitigation Directorate