Loading...
Mansions Phase 1-CS 980723 ENGINEERS · PLANNERS July 23, 1998 Mr. Larry Davis Construction Inspector City of Coppell P.O. Box 478 Coppell, Texas 75019 Reference: As-Built Fire kane Pavement Verification Mansions By The Lake - Phase I Dear Mr. Davis: We received the as-built top of pavement spot elevations for the 24-foot fire lane from Loyd Bransom Surveyors, Inc. on July 21, 1998. From review of these as-built pavement verification grades it does appear that the fire lane generally conforms to the design specifications as shown on the approved construction plans prepared by Washington & Associates, Inc. for Mansions By Ihe Lake - Phase I. Please contact our office if you have any questions. Sincerely, WASHINGTON & ASSOCIATES~ INC. Joseph T. Reue cc: Tony Martin, Newport Classic Homes 0'z239g-I .J'FRtgh 500 GRAPEVINE HWY. · SUITE 375 · HORST, TEXAS 76054 · 817/485-0707 · METRO 8171498-3077 · FAX 817/485-4106