Loading...
Northlake 635(2)-LR 970814TECHNOLOGIES INC Ma) 2l CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR AND BELTLINE RD COPPELL TX PAGE 1 OF 4 PROJECT NO.: 090 REPORT NO.: 1201' DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 8/i Test compressive strength specimens prepared in conjunct inspection. CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 74 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 4-5" METHOD OF TEST SAMPLING: MOLDING & CURING: SLUMP: TEMPERATURE: AIR CONTENT: UNIT WEIGHT: CAPPING/PADS: TESTING: AIR: 3-6% ASTM C-172 ASTM C31 ASTM C143 ASTM C1064 ASTM C231 N/A ASTM C617 ASTM C39 CYLINDER MARKED SET NO. 1 2 3 PROJECT DATA MIX DESIGN NUMBER: 936~ CLASS OF CONCRETE: 400( DATE OF PLACEMENT: 7/: TIME SAMPLED: 06 = 30~ TEMPERATURE (DegF) - AIR: TRUCK NO: 499 MEASURED SLUMP (in.): 5. AIR CONTENT(%): 4.2 LOCATION OF PLACEMENT: Approach to west eno REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS DATE AGE TESTED (daw) 7/24/97 7 8/14/97 28 8/14/97 28 MAXIMUM COMPRESSIVE DIAMETER AREA LOAD STRENGTH (in.) (sq.in.) (lbs. force) (psi) FF 6.00 28.27 98080 3470 CC 6.00 28.27 125770 4450 CC 6.00 28.27 125080 4420 CC 1 4 HOLD ADDITIONALCOMMENTS: 5 Gallons of water added at site. Technician: Anthony Lively Technician Report Of Tests Continued On Page 2 :im Tach. · Southwestern Labs ;75 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 )7 ~/17/97 tarlie L4/97 .on with concrete PSI @ 28 DAYS 7/97 BY: Anthony Lively 7 CONCRETE: 90 TICKET NO: 414385 ~0 UNIT WEIGHT(pcf): N/A to parking lot. ~CTURE TYPE REMARKS NE Our letters ~nd ref)ort~ are for the exclusive uN of the client to whom they are eddre~ed ~cI ahNI net be reproduce :f except in full without the aOproval of the tearing laboratoW. The use of our name must receive out written ~provii. Out lett, ir~ ancI reloOr~ 1001 DY a~l~ly orfl¥ to the lalm~oll te~ted end/or inel~ected, ~ are net indicative of the quantitie~ of IOl~entl¥ identicii or Iii ~ilar pr~ductl. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 7/17/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 74 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 4-5" AIR: 3-6% METHOD OF TEST SAMPLING: MOLDING & CURING: SLUMP: TEMPERATURE: AIR CONTENT: UNIT WEIGHT: CAPPING/PADS: TESTING: ASTM C-172 ASTM C31 ASTM C143 ASTM C1064 ASTM C231 N/A ASTM C617 ASTM C39 CYLINDER MARKED OATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 9363 CLASS OF CONCRETE: 4000 DATE OF PLACEMENT: 7/1 TIME SAMPLED: 07 = 30AM TEMPERATURE (DegF) - AIR: 9, TRUCK NO: 498 MEASURED SLUMP (in.): 5.0 AIR CONTENT(%): 4.2 LOCATION OF PLACEMENT: Parking lot west sid from north line. 10 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - (3 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) (in.) {sq.in.) (lbs. force) (psi) FR 2 i 7/24/97 7 2 2 8/14/97 28 2 3 8/14/97 28 2 4 HOLD 6.00 28.27 88060 3110 CO 6.00 28.27 108930 3850** COl 6.00 28.27 110520 3910'* COl ** Does not comply with specified strength. ADDITIONALCOMMENTS: 10 Gallons of water added Notified concrete foreman at site. and superintendant of concrete te~ Technician: Anthony Lively Technician Report Of Tests Continued On Page 3 REPORT NO. 120197 PAGE 2 OF 4 SET NO. 2 PSI @ 28 DAYS 7/97 BY: Anthony Lively CONCRETE: 96 TICKET NO: 414395 UNIT WEIGHT(peri: N/A to building 20'south · West from east line. CTURE TYPE REMARKS ~E ~E .perature. Our lette~! and res)rolm ale fo~ the exclusive uae of the client to whom they iKii ~cldraaeed end shell not be reproduce I exce~ot in full wit:ho~ the i~Ol=Covd of the testing laboratory. The ule of our flame muir receive our written II)l)rOVl~. Our lett~ ri eno rel)ortl 1001 DY ~pp~y 0flay to the 14topic tilted IIldlor inlAlcted, lad Ifil flor il~iCltivl Of the qulntitill Of Ipplrlntly identical ~' lir lillr p~oductl. Lincoln Property Co. PROJECT NO. 0903605034 OATE OF SERVICE: 7/17/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( C on t i nued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 74 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 4-5" AIR: 3-6% METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 9362 CLASS OF CONCRETE: 400( DATE OF PLACEMENT: 7/] TIME SAMPLED: 09:30AM TEMPERATURE (DegF) - AIR: TRUCK NO: 491 MEASURED SLUMP (in.): 6. AIR CONTENT(%): 6 LOCATION OF PLACEMENT: In front of bay dooz REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH {days) {in.) {sq.in.I {lbs. force) {psi~ FF 3 1 7/24/97 7 3 2 8/14/97 28 3 3 8/14/97 28 6.00 28.27 102680 3630 CC 6.00 28.27 122190 4320 CC 6.00 28.27 124990 4420 CC 3 4 HOLD Technician: Anthony Lively Technician Report Of Tests Continued On Page 4 REPORT NO. 120197 PAGE 3 OF 4 SET NO. 3 ' PSI @ 28 DAYS 7/97 BY: Anthony Lively 2 CONCRETE: 88 TICKET NO: 414411 o UNIT WEIGHT(pcf): N/A ACTURE TYPE REMARKS Ou~ letter~ and repcxt~ ere fo~ the exclusive uae of t~ ~i~ to wh~ t~y ~e ~r~ ~ ~ not ~ ~u~ d except in ~1 wit~ t~ agprovN of t~ t~ti~ I~ltoW. TM ~ of ~ n~e m~ re~v~.o~ wri~ iEpr~vN.. O~ le~ =m ~ re~ 1001 DY ~y Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 7/17/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 74 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 4-5" AIR: 3-6% METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 936; CLASS OF CONCRETE: 400( DATE OF PLACEMENT: 7/] TIME SAMPLED: 10: 45AM TEMPERATURE (DegF)!- AIR: 9 TRUCK NO: 770 MEASURED SLUMP (in.): 4. AIR CONTENT(%): 5.5 LOCATION OF PLACEMENT: Parking lot in fron REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) (in.) (sq.in.) {lbs. force) (psi) FF 4 1 7/24/97 7 4 2 8/14/97 28 4 3 8/14/97 28 6.00 28.27 96970 3430 CC 6.00 28.27 121210 4290 CC 6.00 28.27 120130 4250 CC 4 4 HOLD ADDITIONAL COMMENTS: 30 Gallons of water added at site. Technician: Anthony Lively Technician Report Distribution: I1) BUTLER CONSTRUCTION INCORPo ~'t (1) BROCKETT-OAVIS-ORAKE, INC. (I) THE CITY OF COPPEI. L (1) THE CITY OF COFq:~ELL (1) O'BRIEN ASSOCIATES, INC. (1) A.E.C.C. Our letter~ arid reloof~l ~l fro, the exclualve u~ of the ciief~t to whom the~ot be reproduce full withou~ the approval of the tearing I~bo~atory. The ule of o<x nerce must recewe our whiten approval Our 1001 DY ~pld¥ o~I¥ to the aample te~ted attcl/ot irmpected, and ~l not indicative of the ClUantitie~ of Ioplrently identical or REPORT NO. 120197 PAGE 4 OF 4 SET NO. 4 PSI @ 28 DAYS 7/97 BY: Anthony Lively 5 CONCRETE: 90 TICKET NO: 414425 0 to bay $7, 10'west. ACTURE TYPE REMARKS NE LABS n, B.S. Ch.E. anager except in ~ilar i~roduct~.