Loading...
Northlake 635(2)-LR 970724 (2)TECHNOLOGIES INC Max CLIENT: PROJECT: REPORT OF CONCRETE COMPRESSIVE STRENGTH Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR AND BELTLINE RD COPPELL TX PAGE i OF 4 PROJECT NO.: 090."' REPORT NO.: 1201 DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 7/i SERVICES: Test compressive strength specimens prepared in conjunct inspection. ~ CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 74 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 4-5" AIR: 3-6% METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED 7/24/97 8/14/97 8/14/97 PROJECT DATA MIX DESIGN NUMBER: 936 CLASS OF CONCRETE: 400, DATE OF PLACEMENT: 7/ TIME SAMPLED: 06: 30AM TEMPERATURE (DegF) - AIR: TRUCK NO: 499 MEASURED SLUMP (in.): 5. AIR CONTENT(%): 4.2 LOCATION OF PLACEMENT: Approach to west en, REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) (in.) (sq.in.) (lbs. force) {psi) F 7 6.00 28.27 98080 3470 C~ 28 28 1 4 HOLD ADDITIONALCOMMENTS: 5 Gallons of water added at site. Technician: Anthony Lively Technician Report Of Tests Continued On Page 2 im Tach.- Southwestern Labs 75 Lone Star Dr. · P.O. Box 224227 Dallas. Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 )7 ?/17/97 %arlie .~4/97 Lon with concrete PSI @ 28 DAYS 7/97 BY: Anthony Lively ~7 CONCRETE: 90 T~CKET NO: 414385 )0 UNIT WEIGHT(pof): N/A to parking lot. ACTURETYPE )NE REMARKS Ow letterl and reports a~e for the exclusive [me of the client to whom they are eddre~aed end shill not full witho~ c~ approval of t~ ~ti~ iaDorato~. T~ ~ of our name m~t recmve our written ipprov~. O~ h 1001 DY apply only to t~ sample t~t~ a~/or i~ct~, ~ ire not ~catlve of t~ quentiti~ of ~p~e~ly identical or simil~ proud. Lincoln Property Co. PROJECT NO. 0903605034 DATE OFSERVICE: 7/17/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Con~:i hued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 74 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 4-5" AIR: 3-6% METHOD OF TEST SAMPLING: MOLDING & CURING: SLUMP: TEMPERATURE: AIR CONTENT: UNIT WEIGHT: CAPPING/PADS: TESTING: ASTM C-172 ASTM C31 ASTM C143 ASTM C1064 ASTM C231 N/A ASTM C617 ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 936.' CLASS OF CONCRETE: 400( DATE OF PLACEMENT: 7 / TIME SAMPLED: 07:30AM TEMPERATURE (DegF) - AIR: TRUCK NO: 498 MEASURED SLUMP {in.): 5. AIR CONTENT(%): 4.2 LOCATION OF PLACEMENT: Parking lot west si( from north line. REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH {days} {in.} (sq.in.} (lbs. force) (psi} FI 2 1 7/24/97 7 2 2 8/14/97 28 2 3 8/14/97 28 6.00 28.27 88060 3110 2 4 HOLD ADDITIONAL COMMENTS: 10 Gallons of water added at site. Notified concrete foreman and superintendent of concrete t~ Technician: Anthony Lively Technician Report Of Tests Continued On Page 3 REPORT NO. 120197 PAGE 2 OF 4 SET NO. 2 PSI @ 28 DAYS 7/97 BY: Anthony Lively 0 CONCRETE: 96 TICKET NO: 414395 ~0 UNIT WEIGHT(pcf): N/A te to building 20'south )0' West from east line. ACTURE TYPE REMARKS )NE ~mperature. Our letters ~ reports are fo~ the ®xclueivo Lie of the client to whom they are addressed a~l ~hell not be. re[rod.u .'~ except in full without the lpprovld of the felting !eb~etory. The u~e ef. ou~ narne m. kmt recelv?our .written ap.pro.va.. u~ ,e Earl and raport~ 1001 DY ~oply o~4y [o ~ =~'tp~ t~t~d II~d/Oi' tf~t~l~, ~ &l'e f"lOl iNlCltlVe or tr~ quantities or ipparel"ltly IolnttCll Or iimilar productl. Lincoln Property Co. PROJECT NO. 0903605034 DATE OFSERVICE: 7/17/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( Cont i nued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 74 SPECIFICATION REQUIREMENTS STRENGTH: 4000p~qi @ 28 SLUMP: 4-5" METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 DAYS AIR: 3-6% CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 9363 CLASS OF CONCRETE: 400C DATE OF PLACEMENT: 7/1 TIME SAMPLED: 09: 30AM TEMPERATURE (DagF) - AIR: 9 TRUCK NO: 491 MEASURED SLUMP (in.): 6. AIR CONTENT(%): 6 LOCATION OF PLACEMENT: In front of bay doo REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH {days) (in.) {sq.in.) (lbs. force) (psi) FI; 3 1 7/24/97 3 2 8/14/97 3 3 8/14/97 7 28 28 6.00 28.27 102680 3630 CC 3 4 HOLD Technician: Anthony Lively Technician Report Of Tests Continued On Page 4 REPORT NO. 120197 PAGE 3 OF 4 SET NO. 3 PSI @ 28 DAYS 7/97 BY: Anthony Lively CONCRETE: 88 TICKET NO: 414411 UNIT WEIGHT(pcf): N/A ACTURE TYPE REMARKS NE Our letters and reportl ~e for the exclUmve uae of the client to whom they are addreeaed and shall not be rel~oduc ~d except in full without the approval of the teatir~ laboratory. The ule of OL~ name mull recmve our written approval. Oul' let ere ~ reportl 1001 DY apply only to the sample teated and/or inspected, and are not indicative of the qulfltitiea of apparently identical or I millr producm. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 7/17/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont i nued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 74 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 SLUMP: 4-5" METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 DAYS AIR: 3-6% CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 936-= CLASS OF CONCRETE: 400C DATE OF PLACEMENT: 7/3 TIME SAMPLED: 10:45AM TEMPERATURE (DegF) - AIR: 9 TRUCK NO: 770 MEASURED SLUMP (in.): 4, AIR CONTENT(%): 5,5 LOCATION OF PLACEMENT: Parking lot in fron REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH {days) {in.) (sq.in.) (lbs. force) (psiI FI: 4 1 7/24/97 7 4 2 8/14/97 28 4 3 8/14/97 28 6.00 28.27 96970 3430 CC 4 4 HOLD ADDITIONALCOMMENTS: 30 Gallons of water added at site. Technician: Anthony Lively Technician Report Distribution: {1) Lincoln Property Co {1) BUTLER CONSTRUCTION INCORP. {1) BROCKS-DAY.OR.E, INC. / (1} THE ClW OF COPPELL ll) THE C[~ OF COPPELL ll) O'BRIEN ASSOCIATES, INC. O~ la.era ~ reports ire fo; t~ ~cl~ive ~ of t~ client [o whom t~y ire f~l without t~ a;0~ovN of t~ t~ti~ laboratow. T~ ~ or o~ name m~t recewe 1001 DY apply only to t~ s~ple t~t~ ~/or i~eect~, a~ are not i~ice;ive of t~ qu~titi~ of app~ently identical REPORT NO. 120197 PAGE 4 OF 4 SET NO. 4 PSI @ 28 DAYS 7/97 BY: Anthony Lively 5 CONCRETE: 90 TICKET NO: 414425 0 to bay #7, 10'west. ACTURE TYPE REMARKS NE LABS ,~ra~ken, B.S. Ch.E. oj ect Manager except in