WA9302-LR 950905 (2)F~'EOTECHNICAL
E GEE Consultants, Inc.
Ei NViRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (2]4) 620-979~
Report Date September 5, 1995 Test Date: August 29, 1995
Client City of Coppell General Report No.: 1
Project 6.0 MG Water Storage Tank Project No.: 95-0220
Identification Cancellation
Method of Test N/A
Results
Scheduled time: 8:00 am
Type of service scheduled: Pier Inspection
Time left lab: 7:45 am
Time arrived at job: 8:05 am
Time left job: 10:15 am
Time returned lab: 10:30 am
Total Charged Time: 2.75 hrs.
Reason: Allied drilling pulled stuck casing from pier A.5-14.3, then began removing water from pier hole.
Then pier rig broke down. Cancelled inspection for rest of day.
Technician:
CO: i~I~'