Loading...
WA9302-LR 950905 (2)F~'EOTECHNICAL E GEE Consultants, Inc. Ei NViRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (2]4) 620-979~ Report Date September 5, 1995 Test Date: August 29, 1995 Client City of Coppell General Report No.: 1 Project 6.0 MG Water Storage Tank Project No.: 95-0220 Identification Cancellation Method of Test N/A Results Scheduled time: 8:00 am Type of service scheduled: Pier Inspection Time left lab: 7:45 am Time arrived at job: 8:05 am Time left job: 10:15 am Time returned lab: 10:30 am Total Charged Time: 2.75 hrs. Reason: Allied drilling pulled stuck casing from pier A.5-14.3, then began removing water from pier hole. Then pier rig broke down. Cancelled inspection for rest of day. Technician: CO: i~I~'