Northlake 635(2)-LR 970506Lincoln Property Co.
PROJECT NO. 0903605034
DATE OF SERVICE: 5/06/97
REPORT OF
CONCRETE COMPRESSIVE STRENGTH
(Co~t i nued)
CONTRACTOR: BUTLER CONSTRUCTION
CONCRETE SUPPLIER: PIONEER
PLANT: 22
SPECIFICATION REQUIREMENTS
STRENGTH: 3000psi @ 28 DAYS
SLUMP: 5"
METHOD OF TEST
SAMPLING: ASTM C-172
MOLDING & CURING: ASTM C31
SLUMP: ASTM C143
TEMPERATURE: ASTM C-138
AIR CONTENT: ASTM C173
UNIT WEIGHT: N/A
CAPPING/PADS: ASTM C617
TESTING: ASTM C39
CYLINDER
MARKED DATE
SET NO. TESTED
PROJECT DATA
MIX DESIGN NUMBER: 9337
DATE OF PLACEMENT: 5/(]
TIME SAMPLED: 11=32~
TEMPERATURE (DegF) - AIR: 7
TRUCK NO: 124
MEASURED SLUMP (in.): 5.
AIR CONTENT(%): 1.0
LOCATION OF PLACEMENT:
Sampled @ Pane]. ~2
REPORT OF TESTS
CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS
MAXIMUM COMPRESSIVE
AGE DIAMETER AREA LOAD STRENGTH
(days) (in.} {sq.in.) Jibs. force) (psi~ F
2 i 5/13/97 7
2 2 5/13/97 7
2 3 6/03/97 28
2 4 6/03/97 28
6.00 28.27 91580 3240 CC
6.00 28.27 98910 3500 CC
6.00 28.27 120250 4250 CC
6.00 28.27 119650 4230 CC
Technician: Ronnie Lauderdale
Technician
Report Distribution:
~1) Line~n P~ePerfY Co.
(1) BUTLE~ CONSTRUCTION INCORP.
{1) BROCKETT-OAVtS.-DI:IAKE, INC.
(I) THE CITY OF COPPELL
(1) THE CITY OF COPPELL
(1) O'BfllEN ASSOCIATES, INC.
(1) A.E.C.C.
1001 LW
REPORT NO. 116329
PAGE 2 OF 2
SET NO. 2
6/97
BY: Ronnie Lauderdale
CONCRETE: 73
TICKET NO: 382906
UNIT WEIGHT(pcf): N/A
nd 3.
ACTURE TYPE REMARKS
NE
NE
NE & SPLIT
NE
rBracken, B.S. Ch.E.
oject Manager
KI except in
miler pr ~h.le~.