Loading...
Northlake 635(2)-LR 970529 (2)TECHNOLOGIES INC Max 25 CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR AND BELTLINE RD COPPELL TX PROJECT NO.; 0903 REPORT NO.: 1171: DATE OF SERVICE: AUTHORIZATI!ON: Oz REPORT DATE: 5/; Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived ¢ scheduled to perform a Drilled Pier Inspection. See attac~ results of the inspection. Technician Time: 7:30am to ll:30am Page 1 of 2 Technician: Francisco Calvillo Technician Report Distribution: (1] Lincoln Prof~erty Co. {1) BUTL~ CONS flUC~ON INCOflP. ll) BROCK~A~DR~E, INC. ll) THE CI~ OF CO.ELL {1) THE Cl~ OF COPPE~ ll) O'8RIEN ASSOCIATES, INC. im Tach. Southwestern Labs 75 Lone Star Dr. P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 '8 1/22/97 Lgoing 19/97 ,n site as ,ed report for ~e~cten' · . . . B S Ch E Manager except in TECHNOLOGIES INC LINCOLN PROPERTY COMPANY Project N~:0903605034 Service Date,:05~22~97 2575 Lone Star Drive · P.O. Box 224227 · Della (214) 631-2700 · Fax (214} 920-18~ DRH.LED PIER INSPECTION (STRAIGHT SHAFT) Texas 75222 Report N": 117178 Page 2 of 2 NOTE: SEE REPORT # 117179 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. · ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. · · ELEVATION BY OTHERS TIME: 7:30 A.M. TO 11:30 A.M. Our letter, and report, ara for the exclusive u~8 of the client to whom they are addreesed and ah,al not be repredt ced except in fuji without the approve/of the te~tJng laboratory. The u~e of our name rnu~ ree~ve prior written approvel of Maxim TeChnelogh e, Inc. Lettare and report, apply only to the temple te~ted and/or in~peoted and are not indicative of the quantity of apparently identical Or similar ~roduot~. Pier identification J4.5 Pier diameter(in)/Type 24 Depth of pier from surface(ft) 40.3 Depth of bearing stratum from surface(fO 32.3 Required penetration(fO 6.0 Actual penetration(fO · 8.0 Condition of bottom(wet/dry) dry Plumb within tolerance(yes/no) yes Casing diameter(in)/Length(ft) 28/1 5 # of bars/Reinforcing bar size(#) 6/#5 Length of reinforcing steel(ft) 40.0 Time drilling was completed(am/pm) 9:50am Time concrete was placed(am/pm} 10:25am Depth of pier from top of concrete(fO 39.3 Elevation: Top of Pier 98.0 Elevation: Bottom of Pier (ft} 58.7 Elevation: Top of Bearing Stratum (ft) 66.7 Bearing Sratum (description) i Gray shale. Date Drilled:OS/22/97***OBSERVATION OF DRILLEI} FOUNDATION CONSTRUCTION***