Loading...
Mansions Phase 1-CS 971126 Federal Emergency Management Agency  Washington, D.C. 20472 Q~ November 26, 1997 Mr. Russell E. Spiars, P.E. IN REPLY REFER TO: Vice President Case No.: 98-06-303R Dunaway Associates, Inc. Co--unities: Cities of Coppell and ~wisville, 2351 West No,west Highway, Suite 3280 Texas Dallas, Texas 75220 Community Nos.: 480170 and 480195 316-ACK.FRQ ~ Spiars: ~is responds to your request dasd November 17, 1997, ~at the Federal Emergency Management Agency (FEMA) issue a conditional revision to ~e Flood Insurance Rate Map (FIRM) for ~e City of Coppell and Denton CounW, Texas and Inco~orated Areas. Pe~inent info~ation about the request is listed below. Identifier: M~sions on ~e Lake Flooding Source: Denton Creek FI~ P~el(s) Affected: 480170 0010 E and 48121C0685 E We have complet~ an invento~ of ~e items ~at you submitted. The items identified below are required before we can begin a derailed review of your request. 1. Our prelim~ review hdicams ~at ~is request also affec~ ~e City of ~wisville. Please provide a letter from ~e Ciw of ~wisville Chief Executive Officer (CEO) or an official designated by the CEO requesting or ~dorsing ~is request. 2. Our prelimi~ review indicates ~at ~ere is a discrepancy between ~e unencroached runs of the flood having a 1-percent chance of being equaled or exceeded in any given year (base flood) for Denton Creek in ~e multiple profile and fl~way m~els for ~e existing conditions and proposed conditions. Please revise ~e models so ~at ~e unencroached base flood elevations agree for ~e existing conditions and proposed conditions. 3. Please provide a computer diske~e conminhg ~e input and ou~ut files for all of ~e hydraulic m~els submitted. 4. Please extend the mapping of the proposed base floodplain and floodway downstream to Cross Section 35700 and upstream to Cross Section 40650 so that the tie-in of the proposed base floodplain and floodway and the effective base floodplain and floodway is clearly shown. If all required items are not submitted within 90 days of the date of this letter, we will treat any subsequent request as an original submittal, and it will be subject to all submittal/payment procedures. 2 Please direct all required items (except the required fee) and questions concerning your request to our Technical Evaluation Contractor at the following address: Michael Baker Jr., Inc. 3601 Eisenhower Avenue, Suite 600 Alexandria, Virginia 22304 Attention: Mr. Monther S. Madanat (703) 317-6250 When you write us about your request, you must include the case number referenced above in your letter. If you have any questions concerning FEMA policy, or the NFIP in general, please contact Mr. Alan Johnson of our staff in Washington, DC, either by telephone at (202) 646-3403 or by facsimile at (202) 646-4596. Sincerely, Frederick H. Sharrocks, Jr., Chief Hazard Identification Branch Mitigation Directorate Enclosure(s) cc: Mr. Kenneth M. Griffin, P.E. ~ Director of Public Works City of Coppell Mr. Tom Dingier City Engineer City of Lewisviile