WA9302-LR 950824 GEE Consultants, Inc.
2540 Glenda Lane * Suite 108
Dallas, Texas 75229
To: Mr. Ken Griffin Invoice No.: 5196-1
City of Coppell Invoice Date: August 24, 1995
P.O. Box 478
Coppell, Texas 75019
214-304-3679
Project: Field and Laboratory Testing Performed
August, 1995
6.0 MG Ground Water Storage Tank
Coppell, Texas
Terms: Due Upon Receipt
Date of
Sampling Description Quantity Rate Total
08-07-95 Moisture Density Relationship Test I ca $125.00 $125.00
08-07-95 AUcrbcrg Limits Tests 1 ea $32.00 $32.00
08-07-95 Percent Passing No. 200 U.S. Sieve Tests 1 ca $18.00 $18.00
08-10-95 In-Place Density Tests 4 ca $25.00 $100.00
08-10-95 Trip Charge 1 ca $12.50 $12.50
08-11-95 In-Place Density Tests 7 ea $25.00 $175.00
08-11-95 Trip Charge 1 ca $12.50 $12.50
08-14-95 In-Place Density Tests 7 ca $25.00 $175.00
08-14-95 Trip Charge I ca $12.50 $12.50
08-17-95 Sampling Concrete Mix Design Materials 8 hrs $29.75 $238.00
08-17-95 Trip Charge 2 ca $12.50 $25.00
08-19-95 Portland Cement Concrete Mix Design (no
aggregate properties) 1 ca $50.00 $50.00
08-19-95 Confirmation Mix Design Tests Cylinders 6 ca $20.00 $120.00
Please Pay C~ ,(D. 1~: (D I 3 I| ~,, _~~
cc: Mr. Gary Hendrix - Shimek, Jacobs and Finklea