Loading...
Mansions Phase 1-CS 971122 Coppell, Texas 75019 214-462-0022 ~i.,,/~~The City with A Beautiful Future,.' ., November 22, 1997 Rick Simmons Western Rim Investors, L.C.C. P.O. Box 426 Colleyville, TX 76034 RE: The Mansions By The Lake (Phase 1) Development Fee Assessment Dear Mr. Simmons: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the mount of $402,957.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, 19 Kenneth M. Gri_~n, P.E. Director of Engineering & Public Works cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE WORKSHEET PROJECT: The Mansions By The Lake (Phase 1) DATE: 11/22/97 Water Impact Fee: Domestic Meter(s): 2 - 4 inch 50 ESU's Irrigation Meter(s): ESU's ESU's Fireline Meter(s): 2 - 8 inch 2.5 ESU°s Total #: 52.5 ESU's @ $450.00 ea. $23,625.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. 0100.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic/Fire): Total #: 2 8"X4" Meter(s) @ $7,284.90 $14,569.80 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 0 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 2 Meter(s) @ $30.00 ea. $60.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. $70.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 50 @ $450.00 ea. $22,500.00 Wastewater Tap Inspection Fee: Total #: 2 Domestic Water Connections @ $50.00 ea. $100.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 2 @ $50.00 ea. $100.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A 189 Multi-family @ $1285.00 / Unit $242,865.00 (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $113,967.00 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street' Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: The Mansions By The Lake (Phase I) DATE: 11/22/97 ROADWAY IMPACT FEE: Service Area * 1 Category ** Residential Land Use ** Multi-Family Building Size (Sq. Ft.) N/A Development Units ** 189 Vehicle Miles per Development Unit ** 2.01 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x ] (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $113,967.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)