Loading...
Northlake 635(2)-LR 970522 (4)Max TECHNOLOGIES INC CLIENT: PROJECT: REPORT OF CONCRETE COMPRESSIVE STRENGTH Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT NO.: 090'~ REPORT NO.: 1158 COPPELL BUSINESS CENTER DATE OF SERVICE: WRANGLER DR. & BELTLINE RD. AUTHORIZATION: C COPPELL, TX REPORT DATE: 5/. PAGE 1 OF 8 SERVICES: Test compressive strength specimens prepared in conjunct inspection. CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000pgi @ 28 DAYS SLUMP: 5" METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: N/A UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 PROJECT DATA MIX DESIGN NUMBER: 934' DATE OF PLACEMENT: 4/i TIME SAMPLED: 04: TEMPERATURE (DegF) - AIR: TRUCK NO: 938 MEASURED SLUMP (in.): 5 AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Building A floor sl. REPORT OF TESTS~ CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MARKED DATE AGE SET NO. TESTED (days) 1 1 5/01/97 7 1 2 5/01/97 7 I 3 5/22/97 28 1 4 5/22/97 28 MAXIMUM COMPRESSIVE DIAMETER AREA LOAD STRENGTH (in,) {sq.in.) {lbs. force) (psi) F 6.00 28.27 127180 4500 C~ 6.00 28.27 121980 4310 C~ 6.00 28.27 152720 5400 C~ 6.00 28.27 148020 5240 C~ Technician: Phillip L. Forrest Technician Report Of Tests Continued On Page 2 im Tech. · Southwestern Labs 75 Lone Star Dr. · P.O. Box 224227 Dallas. Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 77 ~/24/97 %arlie .)2/97 .on with concrete :4/97 BY: Phillip L. Forrest i7 CONCRETE: 78 TICKET NO: 357400 UNIT WEIGHT(pcf): N/A [b B.2/2 ~ACTURE TYPE REMARKS )NE )NE )NE )NE Ou~ ottem end reportl ere for the exclUl~ve uae of the client to whom they ere ~ddrea~d and cheil not be re~rodu :ed except in full without the approval of the teltir~l laboratory. The ule of ou~' name mL~lt receive our written approval, uu~ c £terl eno reportl 1001 LW 813ply only to the same=la ta~ted and/or inl~cted, anti ere not indicative of the quantitiea of apparenl~ly identical or limiler producta. Lincoln Property Co. PROJECT NO. 0903605034 DATE OFSERVICE: 4/24/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST SAMPLING: ASTM MOLDING & CURING: ASTM SLUMP: ASTM TEMPERATURE: ASTM AIR CONTENT: N~A UNIT WEIGHT: N/A CAPPING/PADS: ASTM TESTING: ASTM C-172 C31 C143 C1064 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 934 DATE OF PLACEMENT: 4/ TIME SAMPLED: 06: TEMPERATURE (DegF) - AIR: TRUCK NO: 482 MEASURED SLUMP (in.): 5. AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Building A floor sl C617 C39 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X MAXIMUM AGE DIAMETER AREA LOAD {days1 {in.) (sq.in.) (lbs. force) 12 CYLINDERS COMPRESSIVE STRENGTH {psi) F 2 1 5/01/97 2 2 5/01/97 2 3 5/22/97 2 4 5/22/97 7 6.00 28.27 117570 7 6.00 28.27 115640 28 6.00 28.27 159280 28 6.00 28.27 153100 4160 C 4090 C 5630 C 5410 C Technician: Phillip L. Forrest Technician Report Of Tests Continued On Page 3 REPORT NO. 115877 PAGE 2 OF 8 SET NO. 2 .~4/97 BY: Phillip L. Forrest i8 CONCRETE: 75 TICKET NO: 357410 25 UNIT WEIGHT(pcf): N/A ~b C-1.5 F{ACTURE TYPE REMARKS DNE DNE DNE Our lettem and ret3oft~ are for the axclualve L~e of the client to whom they ~e eddre~lad and shall not be reprorh .ced except in full without the approval of the teltin~ leborltofy. The u~e of our name mL~lt receive our written approv'a. Our I ittere 11'~3 roi)Oral 1001 LW apply only to the soml3ie te~ted anti/or inl0ected, end are not in¢licetive of the quentitiel of apparently identical of similar prorlucte. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 4/24/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 SLUMP: 5" METHOD OF TEST SAMPLING: ASTM MOLDING & CURING: ASTM SLUMP: ASTM TEMPERATURE: ASTM AIR CONTENT: N/A UNIT WEIGHT: N/A CAPPING/PADS: ASTM TESTING: ASTM DAYS C-172 C31 C143 C1064 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 934(. DATE OF PLACEMENT: 4/,' TIME SAMPLED: 07:07AM TEMPERATURE (DegF) - AIR: TRUCK NO: 938 MEASURED SLUMP (in.): 5. AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Building A slab D.5 C617 C39 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X MAXIMUM AGE DIAMETER AREA LOAD (days) {in,) {sq.in.) {lbs. force) 12 CYLINDERS COMPRESSIVE STRENGTH (psi) FI 3 1 5/01/97 3 2 5/01/97 3 3 5/22/97 3 4 5/22/97 7 6.00 28.27 122730 4340 C( 7 6.00 28.27 126940 4490 C( 28 6.00 28.27 145580 5150 C( 28 6.00 28.27 146490 5180 C( Technician: Phillip L. Forrest Technician Report Of Tests Continued On Page 4 REPORT NO. 115877 PAGE 3 OF 8 SET NO. 3 ;4/97 BY: Phillip L. Forrest 0 CONCRETE: 76 TICKET NO: 357415 :5 UNIT WEIGHT(pcf): N/A at 3.5 IACTURE TYPE REMARKS ~NE ~NE ~NE ~NE Our letters a~l reports are for the exclusive u~ of the client to whom they are iddre~ed and shill not be reprodu, ed except in full without the approval of the testing laboratory. The use of ~ name must receive our written approval. Our le terl ~ repo~ 1001 LW apply only to the sample tested and/or in~ected, ~d are not indicative of the quamtitie~ of a~3parenfly identical or I imilar products. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 4/24/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000pa£ @ 28 DAYS SLUMP: 5" METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: N/A UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 934c. DATE OF PLACEMENT: 4/; TIME SAMPLED: 08:40AM TEMPERATURE (DegF) - AIR: TRUCK NO: 499 MEASURED SLUMP (in.): 5. AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Building A- slab E/~' REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) {in.) (sq.in.) (lbs. force) (psi) FF 4 1 5/01/97 7 4 2 5/01/97 7 4 3 5/22/97 28 4 4 5/22/97 28 6.00 28.27 124930 4420 Cf 6.00 28.27 125350 4430 C( 6.00 28.27 163470 5780 C( 6.00 28.27 162320 5740 C( Technician: Phillip L. Forrest Technician Report Of Tests Continued On Page 5 REPORT NO. 115877 PAGE 4 OF 8 SET NO. 4 4/97 BY: Phillip L. Forrest 7 CONCRETE: 70 TICKET NO: 357045 5 UNIT WEIGHT(pcf): N/A .0 ~,ACTURE TYPE REMARKS ,NE ,NE ~NE ~NE Our lettem end reports are for the exclusive use of the client to whom they Ye ~ldrmed ar, d shall not be. re~..rod.uc ed except in full without the approval of the te~tin~ laboratory. The use of ou~ name must receive ou~ written al~proval, uur lei ~el'e a~d reports 1001 LW ml;l~l¥ only to the semi,lo te~tl~l end/el' inspected, and ere not ir~icetiYe of the quamtitie~ of a~l~&rently identical or I imilar I~rnducts. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 4/24/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( Cont i hued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: N~A UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 934! DATE OF PLACEMENT: 4/~ TIME SAMPLED: 09: 50RM TEMPERATURE (DegF) - AIR: TRUCK NO: 562 MEASURED SLUMP (in.): 6. AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Building A floor sl REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH {days) (in.) (sq.in.) {lbs. force) {psi) Fl 5 i 5/01/97 5 2 5/01/97 5 3 5/22/97 5 4 5/22/97 7 6.00 28.27 128370 4540 C( 7 6.00 28.27 120450 4260 C¢ 28 6.00 28.27 161320 5710 C( 28 6.00 28.27 159340 5640 Technician: Phillip L. Forrest Technician Report Of Tests Continued On Page 6 REPORT NO. 115877 PAGE 5 OF 8 SET NO. 5 4/97 BY: Phillip L. Forrest 9 CONCRETE: 74 TICKET NO: 357055 )0 UNIT WEIGHT(pcf): N/A tb F-3 :~ACTURE TYPE REMARKS )NE )NE )NE )NE Out letter~ and reportl ers for the excluaivs uae of the client to whom they ere eddrsaaed and shall not be reprodu :ed sxcel~t in full without the approval of the telling laboratory. The tree of our nlme mu~t recmvs out written spprov'a, Our la Rem ~ reportl 1001 LW apply only to the sample tested a~cl/or inspected, ~ ire not indicative of the quant~tiel of apparently identical or ~imder productl. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 4/24/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 SLUMP: 5" METHOD OF TEST SAMPLING: ASTM MOLDING & CURING: ASTM SLUMP: ASTM TEMPERATURE: ASTM AIR CONTENT: N/A UNIT WEIGHT: N/A CAPPING/PADS: ASTM TESTING: ASTM DAYS C-172 C31 C143 C1064 CYLINDER MARKED DATE SET NO, TESTED PROJECT DATA MIX DESIGN NUMBER: 934 DATE OF PLACEMENT: 4/ TIME SAMPLED: 11: 19AM TEMPERATURE (DegF) - AIR: TRUCK NO: 562 MEASURED SLUMP (in.): 5. AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Building A floor sl C617 C39 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH- 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH {days) (in.) (sq.in.) {lbs. force) {psi) F 6 1 5/01/97 6 2 5/01/97 6 3 5/22/97 6 4 5/22/97 7 6.00 28.27 112920 3990 C~ 7 6.00 28.27 133630 4730 Cl 28 6.00 28.27 162860 5760 C~ 28 6.00 28.27 160690 5680 C~ Technician: Phillip L. Forrest Technician Report Of Tests Continued On Page 7 REPORT NO. 115877 PAGE 6 OF 8 SET NO. 6 ).4/97 BY: Phillip L. Forrest i8 CONCRETE: 75 TICKET NO: 357066 .~5 UNIT WEIGHT(pcf): N/A [b G-2 ~ACTURE TYPE REMARKS )NE )NE )NE )NE Our letters and reporte ere for the exclueive uae of the client to whom they are addrelled and shall not be reprodu :ed except in full without the approval of the te~ting laboratory. The ule of ou~ name mu~t receive o~' written approval. Our I~ tterl and reportl 1001 LW apply only to the sample tea(ed and/or inspected, and are not incIice[ive of the quantitiel of apparently identical or mimiiar productl. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 4/24/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( Cont i hued) PROJECT DATA CONTRACTOR: BUTLER CONSTRUCTION MIX DESIGN NUMBER: 934~. CONCRETE SUPPLIER: PIONEER DATE OF PLACEMENT: 4/~' PLANT: 29 TIME SAMPLED: 12:32PM SPECIFICATION REQUIREMENTS TEMPERATURE [DegF) - AIR: STRENGTH: 4000psi @ 28 DAYS TRUCK NO: 491 SLUMP: 5" MEASURED SLUMP (in.): 5. METHOD OF TEST AIR CONTENT(%): N/A SAMPLING: ASTM C-172 LOCATION OF PLACEMENT: MOLDING & CURING: ASTM C31 Building A floor sl~ SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: N/A UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH SET NO. TESTED {days} {in.} {sq.in.) {lbs. force} (psi) FI 7 1 5/01/97 7 6.00 28.27 130230 4610 C( 7 2 5/01/97 7 6.00 28.27 121650 4300 C( 7 3 5/22/97 28 6.00 28.27 162500 5750 C( 7 4 5/22/97 28 6.00 28.27 156920 5550 C( ADDITIONALC0MMENTS: Fifteen (15) gallons of water added at site. Technician: Phillip L. Forrest Technician Report Of Tests Continued On Page 8 REPORT NO. 115877 PAGE 7 OF 8 SET NO. 7 ',4/97 BY: Phillip L. Forrest 5 CONCRETE: 75 TICKET NO: 357078 ~0 UNIT WEIGHT(pcf): N/A Lb G.9-1.5 IACTURE TYPE REMARKS ~NE ~NE ~NE ~NE Our letters ~nd repo~ are fo~ the exclusive u~e of the client to whom ti'~y are ~dr~ed a~ sh~l not ~ repr~u~ ~ exce~* in f~l witho~ t~ approval of t~ t~ti~ laboratory. T~ ~ of our nlme m~t recmve o~ written agproval. O~ le~ t~ ~rep~ 1001 LW ~ply only to t~ sample t~t~ ~/or i~ct~, a~ are not i~icative of t~ qu~titi~ of apparemly idem/cai or ~/miler pr~tl. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 4/24/97 CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000psi @ 28 DAYS SLUMP: 5" METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: N/A UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED SET NO. 1 2 3 4 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont i nued) 8 8 8 8 PROJECT DATA MIX DESIGN NUMBER: 934c. DATE OF PLACEMENT: 4/; TIME SAMPLED: 01:30PM TEMPERATURE (DegF) - AIR: TRUCK NO: 491 MEASURED SLUMP (in.): 6. AIR CONTENT(%): N/A LOCATION OF PLACEMENT: Building A floor H-~ REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE DATE AGE DIAMETER AREA LOAD STRENGTH TESTED (days) {in.) (sq.in.) (lbs. force) (psi) FF 5/01/97 7 6.00 28.27 135720 4800 CC 5/01/97 7 6.00 28.27 136180 4820 Cf 5/22/97 28 6.00 28.27 157450 5570 CC 5/22/97 28 6.00 28.27 151100 5340 C¢ ADDITIONAL COMMENTS: Fifteen (15) gallons of water added at site. Technician: Phillip L. Forrest Technician Report Distribution: I1) Uncoln Prol~r~y' Ce. [1} BUTLER CONSTRUCTION INCORP. MAXI~ {1] BROCKETT-DAVI~-DRAKE, INC. {1) THE CITY OF COPPELL (1 ] THE CITY OF COPPELL [1) O'BRIEN ASSOCIATES INC. O~ le~em ~ repo~a ~e for t~ excl~ive ~ of t~ client to whom t~d~lll not ~.r~r~c f~l witho~ t~ approval of t~ t~ti~ I~orltery. T~ ~ of o~ name m~t recewe o~ wntten epprovN. O~ let 1001 LW apply only to REPORT NO. 115877 PAGE 8 OF 8 SET NO. 8 4/97 BY: Phillip L. Forrest 5 CONCRETE: 77 TICKET NO: 357088 0 UNIT WEIGHT(pcf): N/A .7/3 ACTURE TYPE REMARKS NE NE NE NE LABS ~B?acken, B.S. Ch.E. oject Manager ~1 ex.pt in