Loading...
Northlake 635(2)-LR 970522 (6)Maxi 25* TECHNOLOGIES IN¢ CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR AND BELTLINE RD COPPELL TX PROJECT NO.: 0903 REPORT NO,: 1168c. DATE OF SERVICE: AUTHORIZATION: REPORT DATE: 5/2 Drilled pier inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived scheduled to perform a Drilled Pier Inspection. See attac results of the inspection. Technician Time: 7:00am-5:00pm Page 1 of 3 Technician: Rusty Bowers Technician Report Distribution: (11 Linceln Property Co. MAXIM TEC (1) BUTLER CONSTRUCTION INCORP. (1) BROCKETT-OAVlS-DRAKE, INC. ~ {1) THE CITY OF COPPELL {1} THE CITY OF COPPELL (1) O'BRIEN ASSOCIATES, INC. / //~ (1) A.E,C.C. Our letteta end reports ere for the exclusive u~e of the client to whom they ere-~;~ires~ed and ~hall not be reproduc full wil;hout the approval of the testing laboratory. The u~e of our name mu~t receive our written approv~l. Our la1 1099 LW ~ply only to the aimple tested erv~J/or ir~pected, end are not indicative of the qu~tities of apparently identical or rn Tach. ·Southwestem Labs r5 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 505034 7 /16/97 going 2/97 n site as ed report for B_~, B.S. Ch.E. ~ject Manager ed except in TECHNOLOGIES INC LINCOLN PROPERTY CO. Project N~:0903605034 Service Date:05~16~97 2575 Lone Star Drive · P.O. Box 224227 * DallaS r Texas 75222 (214) 631-2700 · Fax (214) 920-189 DRILLED PW_,R INSPECTION (STRAIGHT SHAFT) Report Na: 116897 Page 2 of 3 Date Drilled: 05/16/97***OBSERVATION OF DRILLED FOUNDATION CONSTRUCTION*** / A.2-1.6 A.2-1.5 H.9-1.5 ~.8-1.1 A.9-1.1 Pier identification / Pier diameter(in)/Type 18 18 18 18 18 Depth of pier from surface(R) 36.5 37.0 40.0 9.3 37.0 Depth of bearing stratum from surface{ft) 30.0 30.5 33.7 3.0 30.6 Required penetration(ft) 6.0 6.0 6.0 . 6.0 Actual penetration(fO * 6.5 6.5 6.3 6.4 Condition of bottom(wet/dry) trace trace dry trace Plumb within tolerance{yes/no) yes yes yes ry.=s yes casing diameter(in)/Length(ft) n/a n/a n/a~/a n/a //of bars/Reinforcing bar size(//) 4/#5 4///5 4///5 ///5 41//5 Length of reinforcing steel(ft) 34.8 34.8 37.7 ~7.2 35.0 Time drilling was completed(am/pm) 8:25am 9:10am 9:21 amI1 0:34am 10:54am Time concrete was placed(am/pm) 8:40am 9:16am 9:45am 110:44am 11:02am / Depth of pier from top of concrete(R) 35.3 35.3 38.2 137.7 35.5 / Elevation:Surface (ft)* * 99.2 99.7 99.8 9.6 99.5 Elevation:Top of pier (ft)** 98.0 98.0 98.0 8.0 98.0 Elevation:Bottom pier (ft)** 62.7 62.7 59.8 0.3 62.5 Elevation:Top of bearing stratum(R)*° 69.2 69.2 66.1 6.6 68.9 Bearing stratum {Description) Dark gray unweathered shale NOTE: TIME: SEE REPORT # 116898 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 5:00 P.M. Our letters and reports are for the exclusive use of the client to whom they are addressed and shell not be reprod approval of the te~ting laboratory. The use of our name must receive prior written approval of Maxim Technologi only to the ,ample tMted and/or inepected end are not indicative of the quantity of apparently identical or similar JCeCi except in full without the Inc. Lattem and report~ apply )roduct~. TECHNOLOelES LINCOLN PROPERTY CO. Project N~:0903605034 Service Date:05/16/97 2575 Lone Star Drive · P.O. Box 224227 · Dallas, Texas 75222 (214) 631-2700 · Fax (214) 920-189' DRILLED pIER INSPECTION (STRAIGHT SHAFT) Report N=: 116897 Page 3 of 3 Date Drilled:05/16/97***OBSERVATION OF DRILLED FOUNDATION ',ONSTRUCTION*** Pier identification A.2-1.2 H.6-1.1 A.3-1.1 J-1 Pier diameter(in)/Type 18 18 18 24 Depth of pier from surface(ft) 37.7 39.2 36.7 38.5 Depth of bearing stratum from surface(ft) 30.5 33.0 30.3 32.3 Required penetration(ft) 6.0 6,0 6.0 6.0 Actual penetration(ft) * 7.2 6.2 6.4 6.2 Condition of bottom(wet/dry) 2" water trace 3" water dry Plumb within tolerance(yes/no) yes yes yes yes Casing diameter(in)/Length(ft) n/a n/a n/a n/a # of bars/Reinforcing bar size(//) 4/#5 4/#5 4///5 6/#6 Length of reinforcing steel(ft) 35.7 37.2 34.7 36.6 Time drilling was completed(am/pm) 12:31pm 1:10pm 1:34pm 3:04pm Time concrete was placed(am/pm) 1:10p 1:30pm 1:54pm 3:25pm Depth of pier from top of concrete(ft) 36.2 37.7 35.2 37.1 Elevation:Surface (ft)* * 99.5 99.5 99.5 99.4 Elevation:Top of pier (ft} * * 98.O 98.O 98.0 98.0 Elevation:Bottom pier {ft)' ' 61.8 60.3 62.8 60.9 Elevation:Top of bearing stratum(ft)** 69.0 66.5 69.2 67.1 Bearing stratum (Description) Dark. gray unweathered shale NOTE: TIME: SEE REPORT # 116898 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 5:00 P.M. Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not bo reprod[ approval of the tearing laboratory. The use of our name mu~t receive prior written approv,d of Maxim Technologi( only to the sample teated and/or inspected and ara not indicative of the quantity of apparently identical or similar ced except in full without the s, Inc. Letters and report] apply )roducts.