Loading...
WA9302-LR 950824 (2) I'~EOTECHNICAL E GEE Consultants, Inc. E ~NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 3 Method: ASTM D2922 D301.7 D698 Page 1 of Client: City of Coppell Material Description Max. Dry Optimum Density Moisture Project: Vilhge Parkway Water Storage (Lbs/CuFt) Content (%) Test Date: August 14, 1995 1. Reddish brown clayey sand 112.1 14.6 Report Date: August 24, 1995 Required Density (%): 95% to 105 Required Moisture (%): +3% Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Dry Density Moisture Compaction Test No. (Lbs/CuFt) Content (%) Probe Depth 1 Tank pad, select fill, 1st lift 12 106.6 15.5 95.1 6" 6:00 - 15' in from outer edge 1 Tank pad, select fill, 2nd lift 13 107.7 14.7 96.1 6" 7:00 - 10' in from outer edge 1 Tank pad, select fill, 1st lift 14 106.6 16.2 95.1 6" 7:30 - 10' in from outer edge 1 Tank pad, select fill, 3rd lift 15 108.7 17.4 97.0 6" 10:00 - 10' in from outer edge 1 Tank pad, select fill, 3rd lift 16 114.5 14.7 ':02.2 6" 12:00 - 30' in from outer edge I Tank pad, select fill, 3rd lift 17 113.3 14.2 101.1 6" 2:00 - 20' in from outer edge 1 Tank pad, select fill, 3rd lift 18 114.1 12.1 101.8 6" 4:30 - 15' in from outer edge All tests meet project specification requirements cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimeck, Jacobs and FinIdea All letters and reports are for the exclusive use of the client to whom they are addressed and shell not be reproduced without the full approval of GEE Consultants, [oc. Th~ use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected and are not necessarily indicative of the quantities of apparently identical or similar products.