Loading...
Northlake 635(2)-LR 970516 (2)TECHNOLOGIES INC Maxi 25~ CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR AND BELTLINE RD COPPELL TX PROJECT NO.: 0903 REPORT NO.: 1168: DATE OF SERVICE: .= AUTHORIZATION: Or REPORT DATE: 5 / Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived scheduled to perform a Drilled Pier Inspection. See attac results of the inspection. Technician Time: 7:00am to ll:30am Page 1 of 2 Technician: Rusty Bowers Technician Report Distribution: (1) L nceln Property Co. [1} BUTLER CONSTRUCT ON INCORP. (1 } BROCKETT-DAVIS-ORAKE, INC. [11 THE CITY OF COPPELL {11 THE CITY OF COPPELL (11 O'BRIEN ASSOCIATES, INC. (1! A.E.C.C. 109g JS MAXIM TEl Ou~ letterl and roportl are for the exclusive use of the client to whom they are addr___~e~__ and ~1 ~t ~ reDr~l f~l witho~ t~ approvM of t~ t~ti~ laborltoW. T~ ~ of o~ n~e m~t receive ~ wr~ ip~ovM. O~ I ~y ~y to ~ s~P~ t~t~ ~/or i~, ~ ~e not iMic~ive of t~ q~ti~ of ~m~y i~i~ ~ Tach. Southwestern Labs Lone Star Dr. P.O. Box 224227 Dallaa, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 505034 7 ./15/97 ~going 6/97 )n site as ted report for BS ~z~ken, B.S. Ch.E. .'oject Manager except in ~tere and reporm limilar ~'ocluctl. TECHNOLOGIES INC LINCOLN PROPERTY CO. Project N~:0903605034 Service Date:05/15/97 2575 Lone Star Drive · P.O. Box 224227 · Dallas, Texas 75222 (214) 631-2700 · Fax {214) 920-1891 DRILLED pIER INSPECTION (STRAIGHT SHAYI3 Report N~: 116857 Page 2 of 2 Date Drilled:05/15/97***OBSERVATION OF DRILLED FOUNDATION :ONSTRUCTION*** Pier identification A.2-2 Pier diameter(in)/Type 18 Depth of pier from surface(ft) 31.8 Depth of bearing stratum from surface(ft) 38.2 Required penetration(ft) 6.0 Actual penetration(ft) * 6.4 Condition of bottom(wet/dry) Dry Plumb within tolerance(yes/no) Yes # of bars/Reinforcing bar size(#) 4/#5 Length of reinforcing steel(ft) 36.2 Time drilling was completed(am/pm) 9:51 am Time concrete was placed(am/pm) 10:08 am Depth of pier from top of concrete(ft) 36.7 Elevation:Surface (ft)* * 99.5 98.0 Elevation:Top of pier (ft)** Elevation:Bottom pier (ft)* · 61.3 Elevation:Top of bearing stratum(ft)* · 67.7 Bearing stratum (Description) Dark Gra~ Unweathered Shale NOTE: TIME: SEE REPORT #116858 FOR COMPRESSNE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 11:30 A.M. Our letters end reports are for the excJusive use of the cfie~t to whom they are addrmed end she# not be reproch epprovd of the tinting laboratory. The u~e of o~r name rnuat receive prior written approve/of Maxim Tedmoiogi4 only to the .ample te~ted and/or irmpected and are not indicative of the quenfity of alN3arently identical or ~