REPORT OF
DRILLED PIER INSPECTION
Lincoln Property Co.
500 N. AKARD, SUITE 3300
ATTN: LARRY MOON
Dallas, TX 75201
COPPELL BUSINESS CENTER
WRANGLER DR AND BELTLINE RD
COPPELL TX
PROJECT NO.: 0903
REPORT NO.: 1168:
DATE OF SERVICE: .=
AUTHORIZATION: Or
REPORT DATE: 5 /
Perform Drilled Pier Inspection.
REPORT OF INSPECTION
On this date, a Maxim Technologies representative arrived
scheduled to perform a Drilled Pier Inspection. See attac
results of the inspection.
Technician Time: 7:00am to ll:30am
Page 1 of 2
Technician: Rusty Bowers
Technician
Report Distribution:
(1) L nceln Property Co.
[1} BUTLER CONSTRUCT ON INCORP.
(1 } BROCKETT-DAVIS-ORAKE, INC.
[11 THE CITY OF COPPELL
{11 THE CITY OF COPPELL
(11 O'BRIEN ASSOCIATES, INC.
(1! A.E.C.C.
109g JS
MAXIM TEl
Ou~ letterl and roportl are for the exclusive use of the client to whom they are addr___~e~__ and ~1 ~t ~ reDr~l
f~l witho~ t~ approvM of t~ t~ti~ laborltoW. T~ ~ of o~ n~e m~t receive ~ wr~ ip~ovM. O~ I
~y ~y to ~ s~P~ t~t~ ~/or i~, ~ ~e not iMic~ive of t~ q~ti~ of ~m~y i~i~ ~
Tach. Southwestern Labs
Lone Star Dr. P.O. Box 224227
Dallaa, Texas 75222
Telephone: (214) 631-2700
FAX: (214) 920-1891
505034
7
./15/97
~going
6/97
)n site as
ted report for
BS
~z~ken, B.S. Ch.E.
.'oject Manager
except in
~tere and reporm
limilar ~'ocluctl.
TECHNOLOGIES INC
LINCOLN PROPERTY CO.
Project N~:0903605034
Service Date:05/15/97
2575 Lone Star Drive · P.O. Box 224227 · Dallas, Texas 75222
(214) 631-2700 · Fax {214) 920-1891
DRILLED pIER INSPECTION
(STRAIGHT SHAYI3
Report N~: 116857
Page 2 of 2
Date Drilled:05/15/97***OBSERVATION OF DRILLED FOUNDATION
:ONSTRUCTION***
Pier identification A.2-2
Pier diameter(in)/Type 18
Depth of pier from surface(ft) 31.8
Depth of bearing stratum from surface(ft) 38.2
Required penetration(ft) 6.0
Actual penetration(ft) * 6.4
Condition of bottom(wet/dry) Dry
Plumb within tolerance(yes/no) Yes
# of bars/Reinforcing bar size(#) 4/#5
Length of reinforcing steel(ft) 36.2
Time drilling was completed(am/pm) 9:51 am
Time concrete was placed(am/pm) 10:08 am
Depth of pier from top of concrete(ft) 36.7
Elevation:Surface (ft)* * 99.5
98.0
Elevation:Top of pier (ft)**
Elevation:Bottom pier (ft)* · 61.3
Elevation:Top of bearing stratum(ft)* · 67.7
Bearing stratum (Description) Dark Gra~ Unweathered Shale
NOTE:
TIME:
SEE REPORT #116858 FOR COMPRESSNE STRENGTH TEST SPECIMENS.
ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED.
ELEVATION BY OTHERS
7:00 A.M. TO 11:30 A.M.
Our letters end reports are for the excJusive use of the cfie~t to whom they are addrmed end she# not be reproch