Loading...
Northlake 635(2)-LR 970516 (3)TECHNOLOGIES INC Maxi 25~ CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR AND BELTLINE RD COPPELL TX PAGE i OF i PROJECT NO.: 0903~ REPORT NO.: 1165G DATE OF SERVICE: 5 AUTHORIZATION: On REPORT DATE: 5 / 1 Sample concrete at location of placement, perform require prepare and test concrete compressive strength specimens. CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5-7" AIR: NA METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED 1 1 5/15/97 1 2 6/05/97 1 3 6/05/97 PROJECT DATA MIX DESIGN NUMBER: 9349 CLASS OF CONCRETE: 9349 DATE OF PLACEMENT: 5/C TIME SAMPLED: 12 = 48PM TEMPERATURE (DegF) - AIR: 8 TRUCK NO: 390 MEASURED SLUMP (in.): 5. C LOCATION OF PLACEMENT: Pier A.4-1.1 AGE DIAMETER (days} (in.) n Tech. Southwestern Labs '5 Lone Star Dr. P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 i 4 HOLD Technician: Rusty Bowers Technician Report Distribution: (1) Lincoln Property Co. (1) BUTLER CONSTRUCTION INCORP. (1) BflOCKETT-OAV~S-DRAKE, INC. (1) THE CITY OF COPPELL (1) THE CITY OF COPPELL I1) O'8RIEN ASSOCIATES. INC. I1! A.E.C.C. 1001 JS ~05034 4 /08/97 going 6/97 d field tests, 8/97 BY: Rusty Bowers CONCRETE: 88 TICKET NO: 376448 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AREA LOAD STRENGTH (sq.in.} {lbs. forcel (Psi) '. FRACTURE TYPE 28 MAXIM TEC Lawrence Ou~ lettem a~l reportl ere fo~ the e~ive REMARKS -I. SOUTHWESTERN LABS Bracken, B.S. oject Manager ~ox~in milM ~u~s. Ch. E.