Loading...
Northlake 635(2)-LR 970515TECHNOLOGIES INC REPORT OF DRILLED P~R INSPECTION CLIENT: Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: COPPELL BUSINESS CENTER WRANGLER DR AND BELTLINE RD COPPELL TX PROJECT NO.: 0903 REPORT NO.: 1167( DATE OF SERVICE: .~ AUTHORIZATION: Or REPORT DATE: 5 / ] SERVICES: Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived ¢ scheduled to perform a Drilled Pier Inspection. See attac~ results of the inspection. Technician Time: 7:00am to 4:00pm Page 1 of 2 Technician: Rusty Bowers Technician Report Distribution: Il) BROCKETr-DAVIS-DRAKE~ INC. 1) THE CITY OF COPPELL I) THE CITY OF COPPELL t) O'BRIEN AaSOClATF.~, ~NC. (1) A.~C.C. 1099 DY MAXIM TE~ [] Tech. Southwestern Labs ~75 I~ne S~' Dr. P.O. ~ 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1591 505034 8 /14/97 .going 5197 ,n site as ~ed report for [. SO~S~RI~ LABS BX~Cken, B.S. Ch.E. oj ect Manager TECHNOLOGIES INC LINCOLN PROPERTY CO. Project N~:090360~034 Service Date:05/14/97 2575 Lone Star Drive · P.O. Box 224227 * Dallas, Texas 75222 (214) 631-2700 * Fax (214) 920-189 DRILLED pIER INSPECTION (STRAIGHT SHAlq'13 Report NS: 116768 Page 2 of 2 Date Drilled:O5/14/97***OBSERVATION OF DlZILLED FOUNDATION CONSTRUCTION*** Pier identification H.9-8.5 H.9-8.8 H.8-8.9 H.6-8.9 Pier diameter(in)/Type 18 18 18 18 Depth of pier from surface(ft) 38.8 37.5 37.5 37.5 Depth of bearing stratum from surface(ft) 32.3 31.5 31.5 31.3 Required penetration(ft) 6.0 6.0 6.0 6.0 Actual penetration(ft) ° 6.5 6.0 6.0 6.2 Condition of bottom(wet/dry) Trace dry dry 2" Water Plumb within tolerance(yes/no) yes yes yes yes Casing diameter(in)/Length(ft) N/R N/R N/R NIR # of bars/Reinforcing bar size{#) 4/#5 4/#5 4/#5 4/#5 Length of reinforcing steel(ft) 37.2 35.8 36.2 / 35.6 Time drilling was completed(am/pm) 10:58am 11:32am 12:20p~ 12:51 pm Time concrete was placed(am/pm) 11:15am 11:43am 12:41pr~ 2:55pm Depth of pier from top of concrete(ft) 37.7 36.3 36.7 / 36.1 Elevation:Surface (ft)** 99.1 99.2 98.8 / 99.4 Elevation:Top of pier (ft)'* 98.0 98.0 98.0 / 98.0 Elevation:Bottom pier (ft)** 60.3 61.7 61.3 / 61.9 Elevation:Top of bearing stratum(ft)** 66.8 67.7 67.3 / 68.1 Bearing stratum (Description) Dark gray unweathered shale. / NOTE: TIME: SEE REPORT # 116769 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 4:00 P.M. Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be repro~ approval of the te~ting laboratory. The uae of our name must receive prior written approval of Maxim Technolog only to the sample tested and/or inepeuted and are nut indicative of the quantity of apparently identical or simile4 uced except in full without the e~ Inc. Letters and reports apply products.