REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL
Density Report No. 1 Method: ASTM D2922 D3017 D698 Page 1 of
Client: City of Coppell Material Description Max. Dry Optimum
Density Moisture
Project: Vffiage Parkway Water Storage (Lbs/CuFt) Content (%)
Test Date: August 10, 1995 1. Reddish brown clayey sand 112.1 14.6
Report Date: August 24, 1995
Required Density (%): 95% to 105
Required Moisture (%): -t-3%
Mat Location/Elevation (and/or) Lift In-Place In-Place Percent
No. Dry Density Moisture Compaction
Test (Lbs/CuFt) Content (%)
No.
Probe
Depth
I Tank pad select fill, 1st lift
1 109.7 15.9 97.8
6" 11:00-20' inside from tank pad outer edge
1 Tank pad select fill, 1st lift
2 111.2 14.5 99.2
6" 2:00-30' inside from tank pad outer edge
1 Tank pad select fill, 1st lift
3 111.9 16.3 99.8
6" 3:30-55' inside from tank pad outer edge
1 Tank pad select fill, 1st lift
4 108.0 13.5 96.3
6" 3:00-10' inside from tank pad outer edge
All tests meet project specification reqmrements
cc: Mr. Larry Davis - City of Coppell
Mr. Bob Barbarisi, Jr. - Natgun Corporation
Mr. Gary Hendricks - Shimeck, Jacobs and Finklea
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not he reproduced without the full approval of GEE Consultants, Inc. The use of our rome must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or inspected and are not necessarily indicative of the quantities of apparently identical or similar products.