Loading...
Northlake 635(2)-LR 970514TECHNOLOGIES INC M~ CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR AND BELTLINE RD COPPELL TX PROJECT NO.: 09C REPORT NO.: 1165 DATE OF SERVICE: AUTHORIZATION: C REPORT DATE: 5 Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived scheduled to perform a Drilled Pier Inspection. See atta( results of the inspection. Technician Time: 7:00am to 3:30pm Page i of 2 (im Tach. Southwestern Labs 575 Lone Star Dr. P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 3605034 03 5108197 ngoing [4/97 Dn site as ~ed report for Technician: Rusty Bowers Technician Report Distribution: (1) Lincoln Prope~y Co. MAXIM (1) BUTLER CONSTRUCTION INCORP. (1l 8ROCK~*DAVIS-OR~E INC. (1} THE Cl~ OF COPPELL ' (I] THE Cl~ OF COPPELL - (1] O'BRIEN ASSOCIATES. INC. (11 A.E.C.C. ~ ~~~~en, lOgg OY , .... p~em~y iaentic~ TECHNOLOGIES INC 2575 Lone Star Drive · P.O. Box 224227 * Dallas Texas 75222 (214) 631-2700 · Fax (214) 920-189 LINCOLN PROPERTY CO. Project N°:0903605034 Service Date:05~08~97 Report N°: 116503 Page 2 of 2 DRILLED PIER INSPECTION (STRAIGHT SHAFT) Date Drilled:05/08/97***OBSERVATION OF DRILLED FOUNDATION .'ONSTRUCTION*** Pier identification A-2 A-1.6 A-1 A.6-1.1 Pier diameterCin)/Type 24 24 24 18 Depth of pier from surface(ft) 38.7 37.0 36.3 35.4 Depth of bearing stratum from surface(ft) 31.9 31.0 30.3 29.0 Required penetration(ft) 6.0 6.0 6.0 6.0 Actual penetration(ft) ° 6.8 6.0 6.0 6.4 Condition of bottom(wet/dry} trace dry dry trace Plumb within tolerance{yes/no} yes yes yes yes Casing diameter(in)/Length(ft) N/R N/R N/R N/R # of bars/Reinforcing bar size(#) 6/#6 6/#6 6/#6 4/#5 Length of reinforcing steel(ft) 38.0 36.0 35.4 34.6 Time drilling was completed(am/pm) 9:43am 10:57am 12:29pm 2:06pm Time concrete was placed(am/pm} 11:16am 11:12am 12:43pm 2:25pm Depth of pier from top of concrete(ft) 38.5 36.5 35.9 35.1 Elevation:Surface (ft)* * 98.7 98.5 98.4 98.3 Elevation:Top of pier (ft)° ° 98.5 98.0 98.0 98.0 Elevation:Bottom pier (ft}** 60.0 61.5 62.1 62.9 Elevation:Top of bearing stratum(ft)*' 66.8 67.5 68.1 69.3 Bearing stratum (Description) Dark gray unweathered shale. NOTE: TIME: SEE REPORT # 116504 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 3:30 P.M. Our letter, and reports are for the exclusive use of the client to whom they are addressed and shall not approv,d of the te~ting laboratory. The use of our name mu~t receive prior written approval of Maxim only to the sample tested and/or inspected and are not indicative of the quantity of apparently identical or except in full without the es, Inc. Letters and reports apply