Loading...
Northlake 635(2)-LR 970514 (2)TECHNOLOGIES INC Maxi~ 257 CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR AND BELTLINE RD COPPELL TX PROJECT NO.: 0903~ REPORT NO.: 11667 DATE OF SERVICE: 5 AUTHORIZATION: On REPORT DATE: 5 / Drilled pier inspection: REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived scheduled to perform a Drilled Pier Inspection. See attac results of the inspection. Technician Time: 7:00am to 12:30pm 3:30pm to 5:30pm Page 1 of 3 Technician: Rusty Bowers Technician Report Distribution: (1) Lincoln Propert'~ Co. (1) BUTLER CONSTRUCTION INCORP. (1! BROCKETT-DAVIS-DRAKE, INC. 61) THE CITY OF COPPELL 611 THE CITY OF COPPELL (1! O'SRIEN ASSOC6ATES, INC. (1) A.E.C.C. 1099 LW ~ 6/~ p~ Our letters and reports ere for the exclusive use of the client to whom they are addressed and shell not be reprodu¢ full without the approval of the testing laboratory. The use of our name must receive our written approval. Our apply on6y to the sample tested and/or inspected, and are not inaicative of the quarltJtJes of apparently identical or Tech. · Southwestern Labs Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: {214) 920-1891 i05034 3 /13/97 going 4/97 n site as ed report for oject Manager ad except in imilar products. Ch.E. TECHNOLOGIES INC LINCOLN PROPERTY CO. Project N":0903605034 Service Date:05/13/97 2575 Lone Star Drive · P.O. Box 224227 · Dallas, Texas 75222 (214) 631-2700 · Fax (214) 920-189' DRILLED PIER INSPECTION (STRAIGHT SHAFT) Report N~: 116673 Page 2 of 3 Date Drilled:05/13/97***OBSERVATION OF DRILLED FOUNDATION :** / Pier identification J~6 J-6.5 J-7 ~J-7.5 J-5.5 Pier diameter(in)f Type 24 24 24t4 24 Depth of pier from surface(ft) 35.6 39.5 35.3 4.0 35.6 Depth of bearing stratum from surface(ft) 29.5 32.5 29.0 8.0 29.6 Required penetration(ft) 6.0 6.0 6.0 O 6.0 Actual penetration(ft) * 6.1 7.0 6.3ry0 6.0 Condition of bottom(wet/dry) trace 1" water trace 2" water Plumb within tolerance(yes/no) yes yes yes ~,es yes Casing diameter(in)lLength(ft) n/a n/a n/aIls n/a # of bars/Reinforcing bar size(g) 6/#6 6/#6 6/#6 /#6 6/#6 Length of reinforcing steel(ft) 34.1 37.7 33.7 ~3.5 34.5 Time drilling was completed(am/pm) 9:54am 10:56am 11:30amt 1:59am 1:25pm Time concrete was placed(am/pm) 10:38am 11:08am 11:47am ~2:20pm 1:33pm L Depth of pier from top of concrete(ft) 34.6 38.2 34.2 4.0 35.0 Elevation:Surface (ft)** 97.0 97.3 97.1 6.0 97.6 Elevation:Top of pier (ft) ® ° 96.0 96.0 96.0 6.0 97.0 Elevation:Bottom pier (ft) * * 61.4 57.8 61.8 2.0 62.0 Elevation:Top of bearing stratum(fi)** 67.5 64.8 68.1 8.0 68.0 Bearing stratum (Description) Dark gray unweathered shale NOTE: SEE REPORT # 116674 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. TIME: ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M, TO 5:30 P.M. Our let'tam and reports are for the exclusive usa of the client to whom they ara addressed end shall not be reprodt approval of the te~ting laboratory. The usa of our nama must receive prior written approval of Maxim Technologic only to the sample teated end/or inspected and are not indicative of the quantity of apparently identical or similar ced except in full without the s, Inc. Letters and reports apply )roducts. TECH NOLOG)iES INC $c~ce Date:0~/13/97 2575 Lone Star Drive · P.O. Box 224227 · Dallas Texas 75222 (214) 631-2700 · Fax (214) 920-189 Report Na: 116673 Page 3 of 3 DRILLED PIER INSPECTION (STRAIGHT SHAFT) Date Drilled:05/13/97***OBSERVATION OF DRILLED FOUNDATION Pier identification Pier diameter(in)/Type Depth of pier from surface(ft) Depth of bearing stratum from surface(ft) J-9 24 36.5 29.8 Required penetration(ft) 6.0 Actual penetration(ft) ® 6.7 trace Condition of bottom(wet/dry) Plumb within tolerance(yes/no) Casing diameter{in)/Length(ft) # of bars/Reinforcing bar size(#) Length of reinforcing steel(ft) Time drilling was completed(am/pm) Time concrete was placed(am/pm) . Depth of pier from top of concrete(ft) Elevation:Surface (ft) · · Elevation:Top of pier (ft)** Elevation:Bottom pier {ft) ·* Elevation:Top of bearing stratum(ft)** yes n/a 6/#6 35.5 4:15pm 4:30pm 36.0 96.5 96.0 60.0 66.7 CONSTRUCTION*** Bearing stratum {Description) Dark gray unweathered shale NOTE: TIME: Note: SEE REPORT # 116674 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 5:30 P.M. J-4.5 backfilled due to excessive water depth. J-5.0 backfilled due to excessive Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reprod~ approvaJ of the testing laboratory. The use of our name must receive prior written approval of Maxim Technologi, only to the sample tested end/or inspected and are not indicative of the quantity of apparently identical or similar water. Iced except in full without the Inc. Lettar~ end reports apply ~roducts.