Loading...
Northlake 635(2)-LR 970512MaX TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN= LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903 REPORT NO.: 1160: DATE OF SERVICE: , AUTHORIZATION: C] REPORT DATE: 5/: Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived scheduled to perform a Drilled Pier Inspection. See attac] results of the inspection. Technician Time= 7:00am to 1:00pm Page i of 2 Tachnician: Rusty Bowers Technic ian Report Distribution: (~] u~*~ ~, c,~ MAXIM TE( {1! BUTLER CONSTRUCTION INCORP. (1) BROCKETT-OAV~$-DRAKE, INC. ~ (1! A.E.CoC. ~~ Our lettMe ~nd r~gwm ~e f~ ttm excJu~ve ~ ~ ~ ~ [o w~ ~y ~ 1089 DY ~y ~ te ~ ~ t~ ~/M ~, ~ Me ~ I~ M t~ q~it~ ~ ~ ~M M m Tech. Southwestem Labs 75 Lone Star Dr. P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 .3 ~arlie .2/97 )n site as ~ed report for BS ~ j~cec~ken, B.S. Ch.E. Manager TECHNOLOGIES INC LINCOLN PROPERTY CO. Project N°:0903605034 Service Date:04/30/97 2575 Lone Star Drive · P.O. Box 224227 * Dallal Texan 75222 (214) 631-2700 * Fax (214) 920-18.c DRILLED PIER INSPECTION (STRAIGHT SHAFT) Report N~:116013 Page 2 of 2 Date Drilled:04/30/97***OBSERVATION OF DRILLED FOUNDATION CONSTRUCTION*** / Pier diameter(in)/TvPe B.4/9.1 B419.2 1.4/9.3 B.4/9.4 Depth of pier from surface(ft) 18" 18't8" 18' Depth of bearing stratum from surface(ft) 32.5 33.1 6.0 33.0 Required penetration(ft} 26.5 27.0 9.0 26.6 Actual penetration(ft) · 6.0 6.0 O 6.0 Condition of bottom(wet/dry) 6.0 6.1: 6.4 Plumb within tolerance(yes/no) dry dry dry Casing diameter(in)/t, ength(ft) yes yes l.=s yes # of bars/Reinforcing bar size(#) 41#5 41#5~:5 41//5 Length of reinforcing steel(ft) 40 40 40 Time drilling was completed(am/pm) 11:33am 11:08am lO:45am 10:20am / Time concrete was placed(am/pm) 11:45am 11:18am 10:55am 10:35am / Depth of pier from top of concrete(ft) 29.2 30.0 2.7 31.2 Elevation:Surface (ft)* * 97.5 97.3 7.5 97.6 Elevation:Top of pier (ft)** 94.2 94.2 4.2 95.8 Elevation:Bottom pier (ft)** 65.0 64.2 1.5 64.6 Elevation:Top of bearing stratum(ft)* * 71.0 70.3 8.5 71.0 Bearing stratum (Description) Dark gray unweathered sl~ . NOTE: SEE REPORT ~ 116015 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. · TIME: ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 1:00 P.M. NOTE: *Pier Charlie, with Butler Construction, these piers will be placed to 16' below a 2' X 2' X16" pier cap will be added at a later date. Rebar (presently 40'} will be cut to Our letter, and repcxt, are for the excluaive uae of the client to whom they are acklrmed and ~hdl net be repre4 al)lXOVd of the testing labor.tory. The uae of our name must receive prior written approvd of Maxim Techndogi only to the sarr~de te~ted and/ur in~peeted ~nd are not indicative of the quantity of a{oflarent]y Mentica/ur ~imilar )lan top of pier elevation and )roper length at that time. ,,ced except in full without the e., Inc. LeCtern and reporm apply