Loading...
Northlake 635(2)-LR 970512 (2)Maxi~ 257 TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR AND BELTLINE RD COPPELL TX PAGE 1 OF 1 PROJECT NO.: 09031 REPORT NO.: 11623 DATE OF SERVICE: 5 AUTHORIZATION: Ch REPORT DATE: 5 / Observe concrete mixture for consistency at placement lo required field tests, and prepare compressive strength s~ CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 74 BATCH PROPORTIONS PROJECT DATA CLASS OF CONCRETE: 40¢ DESIGN MIX NUMBER: 93E REPORT OF INSPECTION Cement ASTM C-150 564 lbs. Coarse Aggr.: ASTM C-33 1840 lbs. Fine Aggr.: ASTM C-33 1268 lbs. Admix: ASTM C-494 A or D cwt. Admix: ASTM C-260 3.7 cwt. Total Water: 252.0 lbs. Water/Cement Ratio: 0.45 LB/LB n Tech. · Southwestern Labs 5 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 i05034 9 /05/97 arlie 2/97 at[on, perform ecimens. 0 PSI @ 28 DAYS 3 Slump Range (in.) N/A .~ir Content Range (%): N/A Range of Fresh Concrete Wt./Cu. Ft.f N/A Air Temp. Range (DegF): N/A ! Conc. Temp. Range (DegF): N/A Weather Conditions: cloudy / Placement Location: 4' Leave out against w~st side of building "B" Sidewalk & handicap ran~p @ northwest entrance to bldg. "B". 10'x15' No. Cu. Yds. Placed: 30. Technician: Steven Holt Time-Started 06: 30AM SUMMARY OFINSPECTION: The technician observed the concrete mixture at placement concrete was checked for proper mixing, and a visual est[[] made. Also, the concrete was observed for workability, coz uniformity. Samples of concrete were obtained for the re~ and preparation of compressive strength specimens for label Placement location continued: leaTe out. 70' E, 5' north corner of building "B". 3-5' x 5 sidewalk entrance @ nor1 building "B". Test results appear on Report of Concrete Compressive Stre] Technician: Steven Holt Technician Report Distribution: {1) Lincoln Property Co. MAXIM TEC {1) BUTLER CONSTRUCTION INCORP. ~ (. S.OCKETT-O^V,S-O.^KE. ,NC. {1) THE CITY OF COPPELL 1) THE CITY OF COPPELL I1) O'BRIEN ASSOC ATES, INC. Our otters and reports are for the exclusive use of the client to whom they are addre~ed and shell not full without the approval of the teStlr~ aboratory. The use of our name must recmve our written approval Our e 1003 LW apply only to the sample tested and/or inspected, and are not indicative of the quant/tiaa of apparently identical or ,arking area (contd) o. Test Spec.: 4 topped 09: 00AM .ocation. The te of slump was sistency, and [ired field tests ~atory testing. ~rom northwest :h side of tgth. ken, B.S. Ch.E. Manager :ed except in limilM products.