Loading...
Mansions Phase 1-CS 970527C 0 Y E R FAX $ H E E T Pages: ~,, including this cover sheet. COMMENTS: From the desk of... Deanna Klein Construction Accounting Newport Classic Homes Apartment Div. P.O. Box 3105 Grapevine. TX 76099 (817) 215-8100 Fa~c (817) 215-8110 P.01 Nov-21-96 11:21A - LONG CONSTRUCTION & ENG., INC 5503 Silver Bow Trail* Arlington, Texas 76017 Phone (817) 483-0337 * Fax (817) 483-2720 PROPOSAL & SALES CONTRACT A'I-I'N: ANITA OR RICK lof3 Client: WESTERN RIM INVESTORS, L.C.C. Page: Project: THE MANSIONS BY THE LAKE-PHASE I Date: 1113197 CITY OF COPPELL, TX. '- By: CLINT WATER PUBUC 1, 10" X 8" TAP & SLEEVE VALVE 1 EA $2,150.00 $2,150.00 2. 16" BORE WITH CASING PIPE 40 LF $250.00 $10,000.00 3, CONNECT TO EXIST WATER LINE 1 EA $500.00 $500.00 ,./~4.,.~/ 8" PVC 500 LF $16.00 $8,000.00 ~-)'5. 8" X 4" DETECTOR METER WI TURBINE 2 EA $10,849.00 $21,698.00 BYPASS 6. 8" DOUBLE CHECK VALVE 2 EA $3,800.00 $7,600.00 7. 8" X 8" TAP & SLEEVE VALVE 1 EA $2,000.00 $2,000.00 8. 8" GATE VALVE 2 EA $600.00 $1,200.00 9. 1" DOMESTIC SERVICES 5 EA $500.00 $2,500.00 10. CAST IRON FITTINGS 0,5 TN $3,000.00 $1,500.00 11. TRENCH SAFTY 540 LF $1.00 $540.00 12. TEST 540 LF $1.00 $540.00 SUB-TOYAL WATER PUBLIC $58,228.00 WATER PRIVATE 1. 8" PVC 3170 LF $16.00 $50,720.0(~ ' 2. 6" PVC 40 LF $15.50 $620.00 3. 8" GATE VALVES 20 'EA $600.~)0 $12,000.00 ? . 6" GATE VALVES 11 EA $500.00 $5,50Q00 5. 4" GATE VALVES''~ I EA $395.00 $395.00 6. 2" DOMESTIC SERVICE 31 EA $675.00 $20,925.00 7. 8" PVC 9' TO 10' DEEP 345 LF $25.00 $8,625.00 8. FIRE HYDRANT 11 E.A $1,350.00 $14,850.00 9. CAST IRON FITTINGS 4 TN $3,000.00 $12,000.00 10. 'TRENCH SAFTY 3510 LF $1.00 $3,510.00 11. TEST 3510 LF $1.00 $3,510.00 SUB- TOTAL WATER PRIVATE $132,655.00 P.0~ Nov-21-g6 ll:21A _ LONG CONSTRUCTION & ENG., INC 5503 Silver Bow Trail" Arlington, Texas 76017 Phone (817) 483-0337 ' Fax (817) 483-2720 PROPOSAL & SALES CONTRACT Al'TN: ANITA OR RICK 2of 3 Client: WESTERN RIM INVESTORS, L.C.C. Page: Project: THE MANSIONS BY THE LAKE-PHASE I Date: 11/3/97 CITY OF COPPELL, TX. ,. By: CUNT SANITARY SEWER PUBLIC - - 1. 10" SDR-35 18¢;0 LF $18.50 $33,300.00 2. 16" BORE WITH CASING PIPE 40 LF $250.00 $10,000.00 3. 10" C-900 PRESSURE PIPE & 40 LF $47.50 $1,900.0~0 ~)~"')' 4. 15' DIA. MANHOLE 2 EA $2,375.00 $4,750.00 5. 14' DIA. MANHOLE 4 lEA I $1,87500 ! $7,5~ 6. Tt~ENCH SAFETY 1800 LF $1.00 $1,800.00 7. TEST 1800 LF $1.00 $1,800.00 SUB-TOTAL SANITARY SEWER PUBLI ( 86i,050.00 SANITARY SEWER PRIVATE 1. 8" SDR-35 2082 LF $17.50 $36,435.00 ,,,~ ~. 4"LATERALS 31 EA $400.00 $12,400.00 3. STD. CLEANOUT 7 EA $350.00 $2,450.00 ,~v4. 8" C-900 PRESSURE PIPE 140 LF $25.00 $3,500.00 5. 4" CLEAN OUT i EA $300.00 $30000 6. 4' DIA. MANHOLE 6 EA $1.875.00 $11.250.00 7. TRENCH SAFETY 2082 LF $1.00 $2,082.00 8. TRENCH SAFETY PLAN 1 EA $500.00 $500.00 9. TEST 2082 LF $1.00 $2,082.00 SUB-TOTAL SANITARY SEWER PRIVATE $70,999.00 STORM SEWER ~ 1. 30" RCP 40 LF $40.00 $1,600.00 .~ 2. 18" RCP 107 LF $30.00 $3,210.00 ) '3. 12" SDR-35 20 LF $25.00 $500.00 4. 2' GRATE INLET I EA $2,400.00 $2,400.00 ~. 4' GRATE INLET 1 EA $3,200.00 $3,200.00 ROCK RIP RAP 10 SY $120.00 $1,200.00 [7. GRADE TO DRAIN 40' I LS $1,200.00 $1,20Q00 Nov-21-gG ll:21A P.O3 LONG CONSTRUCTION & ENG., 550:3 Silver Bow Trail* Arlington, Texas 760~7' Phone (817) 483-0337 ' Fax (817) 483-2720 PROPOSAL & SALES CONTRACT ATTN: ANITA OR RICK Client: WESTERN RIM INVESTORS, L.C.C. Page: 3 of 3 Proje~: THE MANSIONS BY THE LAKE-PHASE I Date: 11/3/97 CITY OF COPPELL, TX. .. By: CLINT 8. 12" PLUG - - 1 EA $400.00 $400.00 9. TRENCH SAFETY 167 LF $1.50 $250.50 SUB-TOTAL STORM SEWER $13,960.50 SUMMARY: SUB-TOTAL WATER PUBLIC $58,228.00 SUB-TOTAL WATER PRIVATE $13:2,655.00 SUB-TOTAL SANITARY SEWER PUBLIC $61,050.00 SUB-TOTAL SANITARY SEWER PRIVATE $70,999.00 SUB-TOTAL STORM SEWER $13,960J~0 TOTAL UTILITIES $336,892.80' Bid based on the following: . ~ 1. Owner is responsible for all soils testing, staking, bonds, and any city fees. 2. Excess material is to be disposed of on-site. 3. All lines are bid within 5' of buildings and all irrigation is excluded. 4. Encountering hard rock will call for price adjustment of effected items. 5. Bid subject to change upon take-off of final approved plans. Accepted By: ~, ,.,,,...x.. Title:. ! / Date: LONG CONSTRUCTION & ENG., INC 5503 Silver Bow Trail* Arlington, Texas 76017 Phone (817) 483-0337 ' Fax (817) 483-2720 PROPOSAl. & SALES CONTRACT ATTN: KARA LOMBARDI Client: WESTERN RIM PROPERTIES INC. Page: I of 1 Project: MANSIONS BY THE LAKE Date: 1/22/98 COPPELL TX. " By: CLINT CHA~GE O~D~ # '~ -- 1. INSTALL 2" BLOW-OlaF ASSEMBLY 1 -EA $1,575.25' $1-,575.25 2. 'CREDIT" FIR~E' H..YDRANT , . :I-. EA ($1',350.00) (,$1,350.00i.' · Gi~.ND TOTAL CHANGE ;ORDER # 1 '-- . ..... . ix $225.25 CHANGE o~,~.. ._-- ORDER .~c~,','~c~' CC,NT~ACm'O ~ OTHER TO CO.NT-~CTOR.,(~'~'pP~' t -F-~z -[ S o t~ ' ARCHITECT'S PROJECT NO: ""' < .... ~lgc ~. rfc, ,cuslr =umo~,~o C.~.m~ O~ .......................... $ ~ ~ ~ = o Thc (Connm~ Sum) (Cu.~.n~ca ~ ....... P~N.: ~'~ ~ :[nc~u~) ~.~<c; o ~ ~ ~ CAUTION: You should sign la original AIA document whl~ has Ibis caution printed in red. An original ~lurel thai changes will not be oblcured as may occur when d~uments affi reproduced. ~1~-19-g70I--3ZP / - · LONG CONSTRUCTION & ENG., INC 5503 Silver Bow Trail' Arlington, Texas 76017' Phone (817) 483-0337 ' Fax (817) 483-2720 STATEMENT OF WORK COMPLETED AT'I'N: ANITA OR RICK Client: WESTERN RIM INVESTORS, L.C.C. Page: 3 of .3 Project:THE MANSIONS BY THE LAKE-PHASE ! Date: 3/12/1998 CITY OF COPPELL, TX. .. Invoice # 3 .i~E.~ ~ i~:~ ?:.i. ~:';i!ii!~.i:!~.!O~.'.SC~~::?~;i::.~'!:!!~ :i-~':' ~:;,~ ~.~? ii~U~!; !: i i~..CO~' ~'-'~:~: i :~'~.'~.~ .:-': i~'.O~T--:~: :~!i 7. GRADE TO DRAIN 40' $1,200.00, 1 1 $1 ~200.00 '8. '12" PLUG $400.00 I 1 _$400.0(~ 9. TRENCH SAFETY $1.50 167" 167 $250.50 SUB-:TOTAL STORM SEWER CHANGE ORDER #1 INSTALL 2"'BLOW-OFF ASSEMBL~ $1,575.25 I $1,575.2'5 CREDIT FIRE HYDRANT $1,35~.00 ' ~ -1 ($1,350.00). TOTAL CHANGE ORDER #1 CHANGE ORDER #2 '4. 8" PVC $16.00 100 ~ $1,600.00 9.. 1" DOMESTIC SVCS DELETED $500.00 -5 > {$2,500.00) v' 11. 'TRENCH SAFETY $1.00 100 ,--- $100.00 7. 8" PVC 20' DEEP $33.75 345 ,-"$11,643.75 ,/ 4. 5' DIA MANHOLE $2,375.00 1 ..--- $2,375.00 ,/ 6. 4' DIA MANHOLE ~1,875.00 -1 .--(.$1 ;875.00) 6. ROCK RIP RAP $120.00 -10 ~__($1.200.00),,./ 2" WATE~ SVCS BLDG #1 $675.0.0 ...- $675.00 2" IRRIGATION BY ENTRANCE $675.00 ,- ,.$675.0_0 ADJ MH (DUE GRADE ERROR) , $1,250.00 1 "- $1,250.00 v' ABANDON 4" WATER SVCS $150.00 1 $150.00 TOTAL WORK COMPLETED $350,111.50 LESS RETAINAGE ($35,011.15) .- LESS PREVIOUS PAYMENTS, ($291,824.75)' TOTAL AMOUNT DUE $23,475.60 02/07/'1595 20:28 9?23930986 NCH-ADZ~MBL PAGE 04 LONG CONSTRUCTION & ENG., INC ~ (~) ~~? · F~ (817) CHANGE OIM)ER ~ AT'TN: RICK Pro~ect: THE MANSIONS aY THE'LAKE-PHASE I blTY OF C0PPE[.L, ,X. .. "' ' ,1.~,., TRENCH 8AFTY ~ in c, ontrac~ $1.00 .~6~__, ,- 100 $100.00 12. TEST. oontm~--t .. "- ~ " ~1.00 640 100 Sf00.00, ,.~, .--_ ..... . . ,[( / - -_ .........,- ....... .,6, ,'4' DIA, MANHOLE ch- in contract._. $1~875. 5 .-~ ~,$%8r/5.00) -" _. r~L,2' W,~l~n svcs SLOe #~ . .~STS. 00 ~',:. ..... i ...... ~S?tx00 .r" 05..'27.'98 13:3§ E:~( 8172158110 IH~PS/,NCI! _ P01 TRANSSl ! SS ION OK 'F.~/RX M). 4534 CONNECT I ¢)N TF.I. 4854106 CONNECTION 11) START TItlE 0.5...'27 13:26 I~S..'i(;E TI ~IE (19' 03 RESt LT OK