Northlake 635(2)-LR 970508 (4)TECHNOLOGIES INC Maxi~ 257 CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR AND BELTLINE RD COPPELL TX PROJECT NO.: 0903t REPORT NO.: 11613 DATE OF SERVICE: 5 AUTHORIZATION: On REPORT DATE: 5/0 Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived o scheduled to perform a Drilled Pier Inspection. See attach results of the inspection. Technician Time:7:00am to 4:30 pm Page 1 of 3 Technician: Rusty Bowers Technician Report Distribution: {11 Lincoln Prom~n'y Co. (li BUTLER CONSTRUCTION INCORP. (11 BROCKETT-DAVlS-DRAKE, INC. (1} THE CITY OF COPPELL (1) THE CITY OF COPPELL {1) O°BRIEN ASSOCIATES, INC. (1! A.E.C.C. 1099 JS MAXIM TECI Our lettem and report~ a~o fo~ the exclu~i¥o f~l witho~ t~ approv~ of t~ t~ti~ laborltow. n Tach. Southwestern Labs 5 Lone Star Dr. P.O. Box 224227 Dali~, Taxa. 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 i05034 /02/97 ~oing S/97 n site as ad report for BS -B~ac ken, B.S. ~ject Manager nil~' Ixoduc~. Ch. E. TECHNOLOGIES INC LINCOLN PROPERTY CO. Project N°:0903605034 Service Date:05/02/97 2575 Lone Star Drive · P.O. Box 224227 · Dalla; Texas 75222 (214) 631-2700 · Fax (214) 920-189 DRILLED PIER INSPECTION (STRAIGHT SHAFT) Report N~: 116139 Page 2 of 3 Date Drilled: 5~02~97***OBSERVATION OF DRILLED FOUNDATION CONSTRUCTION*** Pier identification · A.9-8.9 · A.2-8 D.7-9 B-9 B.5-9 Pier diameter(in) 18 18 24 24 24 Depth of pier from surface{ft) 37.0 37.5 37.0 36.3 36.5 Depth of bearing stratum from surface(ft) 30.5 31.5 30.5 30.0 30.4 Required penetration(ft) 6.0 6.0 6.0 6.0 6.0 Actual penetration(ft) · 6.5 6.0 6.5 6.3 6.1 Condition of bottom(wet/dry) Dry 2" Water 3" Water 3" Water 1/2"Water Plumb within tolerance(yes/no) Yes Yes Yes Yes Yes # of bars/Reinforcing bar size(#) 4/#5 4/#5 6/#6 6/#6 6///6 Length of reinforcing steel(ft) 36.5 35.5 36.5 35.8 35.0 Time drilling was completed(am/pm) 11:03AM 10:16AM 10:55AM 1:08PM 1:01 PM Time concrete was placed(am/pml 11:22AM 10:36AM 11:05AM 1:22PM 1:12PM Depth of pier from top of concrete(ft) 37.0 36.0 37.0 36.3 35.5 Elevation: Surface (ft)· · 98.0 99.5 95.5 98.0 96.5 Elevation:Top of pier (ft)·· 98.0 98.0 95.5 98.0 95.5 Elevation:Bottom pier (ft)' · 61.0 62.0 58.5 61.7 60.0 Elevation:Top of bearing stratum(ft) ° · 67.5 68.0 65.0 68.0 66.1 Bearing stratum (Description) Dark Gray Unweathered Shale NOTE: SEE REPORT # 116140 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. · ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. · · ELEVATION BY OTHERS TIME: 7:00 A.M. TO 4:30 P.M. Piers A.9-8.9 and A.2-8 were originally laid out and drilled in wrong location pe~ Charlie with Butler Construction. Our letters and reports are for the exclusive usa of the client to whom they are addressed end shall not be repro( Jced except in full without the approval of the testing laboratory. The use of our name must receive prior written approval of Maxim Technolog es, Inc. Letters and reports apply only to the sample tested end/or inspected and are not indicative of the quantity of apparently identical or simil,u )roducts. TECHNOLOGIES INC LINCOLN PROPERTY CO. Project Na:0903605034 Service Date:05/02/97 2575 Lone Star Drive * P.O. Box 224227 · Dallas (214) 631-2700 * Fax (214) 920-1891 DRILLED pIER INSPECTION (STRAIGHT SHAVF) r'exas 75222 Report N°: 116139 Page 3 of 3 Date Drilled: 5/02/97***OBSERVATION OF DRILLED FOUNDATION (:ONSTRUCTION*** Pier identification A.9-9 G.2-9 Pier diameter,in) 23:.3 24 Depth of pier from surface(ft) 33.2 Depth of bearing stratum from surface(fO 30.0 27.0 Required penetration(fO 6.0 6.0 Actual penetration(ft) ° 6.3 6.2 Condition of bottom(wet/dry) ~:s Dry Plumb within tolerance(yes/no) Yes # of bars/Reinforcing bar size(#) 6/#6 6/#6 Length of reinforcing steel(ft) 35.5 32.0 Time drilling was completed(am/pm) 2:44PM 3:05PM Time concrete was placed(am/pm) 2:53PM 3:15PM Depth of pier from top of concrete(ft) 36.0 32.5 Elevation: Surface (ft)° ° 98.3 96.2 Elevation:Top of pier (ft)°' 98.0 95.5 Elevation:Bottom pier (ft)· · 62.0 63.0 Elevation:Top of bearing stratum(fi)** 68.3 [ 69.2 Bearing stratum (Description) Dark Gra~ Unweathered Shale NOTE: SEE REPORT # 116140 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ° ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. * · ELEVATION BY OTHERS TIME: 7:00 A.M. TO 4:30 P.M. Our lettar~ and report~ are for the exclusive u~e of the ciiant to whom they are addresecd and shall not be reprodu ',ad except in full without the approvaJ of the testing laboratory. The use of our name must receive prior written al3provd of Maxim Technologie ~, Inc. Lettam and reeorm al~ly only to the sample tested and/or inspected and are not indicative of the quantity 04 apparentJy idantica~ or limilar rnduct~.