Loading...
Northlake 635(2)-LR 970508 (5)TECHNOLOGIES INC Maxir 257 REPORT OF DRILLED PIER INSPECTION CLIENT: Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: COPPELL BUSINESS CENTER WRANGLER DR AND BELTLINE RD COPPELL TX PROJECT NO.: 0903( REPORT NO.: 11608 DATE OF SERVICE: 5 AUTHORIZATION: Onl REPORT DATE: 5/0; SERVICES: Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived o: scheduled to perform a Drilled Pier Inspection. See attach, results of the inspection. Technician Time: 7:00am to 5:30pm Page 1 of 4 Technician: Rusty Bowers Technician Report Distribution: 1) Lincoln Property Co. {1) BUTLER CONSTRUCT ON INCORP. (1) BROCKETT-DAVlS-DRAKE, INC. (1) THE CITY OF COPPELL (1) THE CITY OF COPPELL {1) O'8RIEN ASSOCIATES, INC. ll ) A.E.C.C. 1099 DY Tech. Southwestern Labs Lone Star Dr. P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 LABS )5034 L /01/97 ~oing 3/9? ~ .... ~ ~r~.ject Manager 1 % site as ed report for Ch.E. TECHNOLOGIES iNC LINCOLN PROPERTY COMPANY Project N~:0903605034 Service Date:5/01/97 2575 Lone Star Drive · P.O. Box 224227 · Dallas, Texas 75222 (214) 631-2700 · Fax (214) 920-1891 DRILLED PIER INSPECTION (STRAIGHT SHAFt) Report N*: 116081 Page 2 of 4 Date Drilled:5/O1/97***OBSERVATION OF DRILLED FOUNDATION C DNSTRUCTION*** / Pier identification A.2/8.5 A.2/8.8 A.3/8.9 1~.5/9 Fl9 Pier diameter(in)/Type 18 18 18t4 24 Depth of pier from surface(fO 37.7 37.8 37.5 5.0 35.0 Depth of bearing stratum from surface(fO 31.1 31.1 31.2 8.5 28.5 Required penetration(ft) 6.0 6.0 6.0 O 6.0 Actual penetration(ft) · 6.6 6.7 6.3 ·: 6.5 Condition of bottom(wet/dry) dry dry dry dry Plumb within tolerance(yes/no) yes yes yes yes yes Casing diameter(in)/Length(ft) N/R N/R N/R; /R N/R //of bars/Reinforcing bar size{//) Length of reinforcing steel(ft) 35.7 36.0 35.7 :~4.1 34.2 Time drilling was completed(am/pm} 10:18am 11:07am 11:43am~0:48am 12:56pm Time concrete was placed(am/pm) 10:33am 11:20am 1:20pm ~l:00am 1:04pm Depth of pier from top of concrete(ft) 36.2 36.5 36.2 4.6 34.7 / Elevation:Top of Pier (ft} 99.5 99.3 99.3 5.9 95.8 Elevation:Top of pier {ft)· · 98.0 98.0 98.0 5.5 95.5 Elevation:Bottom pier {ft) · · 61.8 61.5 61.8 0.9 60.8 Elevation:Top of bearing stratum(ft)·· 68.4 68.2 68.1 7.4 67.3 Bearing stratum (Description) Dark gray unweathered shale. NOTE: TIME: SEE REPORT # 116082 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 5:30 P.M. Our letter~ end reports are for the exclusive tm* of the client to whom they are addra~ed and aha# not be re~'odt approval of the te~ting laboratory. The use of our name must receive prior written approval of Maxim Technologi~ only to the sample te~ted end/or inspected and are not indicative of the quantity of apparently identical or eim~lar ced except in full without the =, Inc. La<tm'= and report~ apply )roduct~. TICHNOLOGIES INC 2575 Lone Star Drive * P.O. Box 224227 * Dallas (214) 631-2700 * Fax (214) 920-189 LINCOLN PROPERTY COMPANY Project Nn:0~036050~a Service Date:5/01/97 75222 Report Na: 116081 Page 3 of 4 DRILLED PW_,R INSPECTION (STRAIGHT SHAFT) Date Drilled:5/01/97***OBSERVATION OF DRILLED FOUNDATION '.ONSTRUCTION*** Pier identification A.5/8.9 E.519 C.4/9 D/9 Pier diameter(in)/Type 18 24 24 24 Depth of pier from surface(ft) 37.3 31.6 35.9 33.9 Depth of bearing stratum from surface(ft) 31.0 25.6 29.6 27.6 Required penetration(ft) 6.0 6.0 6.0 6.0 Actual penetration(ft) * 6.3 6.0 6.3 6.3 Condition of bottom(wet/dry) dry dry dry dry Plumb within tolerance(yes/no) yes yes yes yes Casing diameter(in)/Length(ft) N/R N/R N/R NIR # of bars/Reinforcing bar size(#) 4/#5 6/#6 6/#6 6/#6 Length of reinforcing steel(ft) 35.7 30.7 35.2 33.2 Time drilling was completed(am/pm) 1:16pm 1:48pm 2:45pm 3:26pm Time concrete was placed(am/pm) 1:30pm 1:57pm 2:54pm 3:40pm Depth of pier from top of concrete{ft) 36.2 31.4 35.7 33.7 Elevation:Top of Pier (ft) 99.1 95.7 95.7 95.7 Elevation:Top of pier (ft)** 98.0 95.5 95.5 95.5 Elevation:Bottom pier (ft)* * 61.8 64.1 59.8 61.8 Elevation:Top of bearing stratum(ft)* * 68.1 70.1 66.1 68.1 Bearing stratum (Description) Dark gray unweathered shale. NOTE: TIME: SEE REPORT # 116082 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 5:30 P.M. Our letters and reports are for the exclusive use of the client to whom they ara addressed and shall not approval of the testing laboratory. The ~se of our name must receive prior written approval only to the sample tested and/or inspected and are not indicative of the quantity of apparently identical or except in full without the es, Inc. Letters and reports apply TECHNOLOGIES INC LINCOLN PROPERTY COMPANY Project N~:0903605034 Service Date:5/01/97 2575 Lone Star Drive * P.O. Box 224227 * Dallas (214) 631-2700 · Fax (214) 920-189 DRILLED PIER INSPECTION (STRAIGHT SHAFT) Texas 75222 Report Na: 116081 Page 4 of 4 Date Drilled:5/Ol/97***OBSERVATION OF DRILLED FOUNDATION Pier identification Pier diameter(in)/Type Depth of pier from surface(ft) Depth of bearing stratum from surface{fO Required penetration(ft) Actual penetration(ft) * Condition of bottom(wet/dry) Plumb within tolerance(yes/no) Casing diameter(in)/Length(ft) # of bars/Reinforcing bar size(#) Length of reinforcing steel(fO Time drilling was completed(am/pm) Time concrete was placed(am/pm) Depth of pier from top of concrete(ft) Elevation:Top of Pier (ft) Elevation:Top of pier (ft)** Elevation:Bottom pier (ft)° ° Elevation:Top of bearing stratum(ft)°e Bearing stratum (Description) NOTE: SEE REPORT # 116082 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. TIME: ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 5:30 P.M. Our lattem a~d repor~ are for the exclusive use of the client to whom they me addrea~ed and shall not be repro ,pprov& of the t.ting laboratory. The use of our name must receive prior writtefl aoproval .of .M. ax!m ,Tech.nol.? only to the eannple teated and/or inspected and are not indicative of the quantity of apparefltly ~aentJc'~ or aa'naa :ONSTRUCTION*** iray unweathered shale. ]uced except in full without the Inc. Lettem and report8 al)ply producta.