Loading...
Northlake 635(2)-LR 970513 (6)Maxir 257 TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903E REPORT NO.: 11601 DATE OF SERVICE: 4 AUTHORIZATION: Ch REPORT DATE: 5/1 Drilled Pier Inspection: REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived o scheduled to perform a Drilled Pier Inspection. See attach results of the inspection. Technician Time: 12:00pm-6:00pm Page 1 of 2 Technician: Gary Kamrath Report Distribution: 11 Lincoln Property Co. MAXIM TECI (1l BUTLER CONSTRUCT ON INCORP. (1) BROCKETT-DAVIS-DRAKE, INC. ~ (1l THE CITY OF COPPELL (11 THE CITY OF COPPELL (1) O°BRIEN ASSOCIATES, INC. (1) A.E.C.C. r Our latt .... nd report .... for the exclu~i .... f the client to whom they are ac~~ full without the approval of the testing laboratory. The u~e of our name mu~t recetve our wntten approval Our let 1099 LW a~ply only to the sample I~e~ted and/or inspected, and are not indicative of the quantitie~ of apparently identical or a, Tech. · Southwestern Labs Lone Star Dr. · P.O. Box 224227 Dallas. Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 )5034 /30/97 ~rlie 3/9? 3 site as ad report for ~N LABS ~Da~en-- - , B. S. Ch. E. ~ject Manager ~ except in ers and repo~t~ miler ~ucta. TICHNOLOGIi.! INC LINCOLN PROPERTY CO. Project N~:0903605034 Service Date:04/30/97 2575 Lone Star Drive · P.O. Box 224227 · Dallas, Texas 75222 (214) 631-2700 * Fax (214) 920-1891 DRILLED PIER INSPECTION (STRAIGHT SHAFY) Report Na: 116014 Page 2 of 2 Date Drilled:04/30/97***OBSERVATION OF DRII.LED FOUNDATION 2ONSTRUCTION*** Pier identification G.3/9.4 G.3/9.3 G.3/9.2 G.3/9.1 Pier diameter(in)/Type 18" 18" 18" 18" Depth of pier from surface(ft) 35.3' 34.5' 34.0' 34.5' Depth of bearing stratum from surface(ft) 28.9' 28.0' 27.8' 28.0' Required penetration(ft) 6.0' 6.0' 6.0' 6.0' Actual penetration(ft) * 6.4' 6.5' 6.2' 6.5' Condition of bottom(wet/dry) dry note 1 dry note 1 dry note 1 dry note 1 Plumb within tolerance(yes/no) yes yes yes yes Casing diameter(in)/Length(ft) n/a n/a n/a n/a # of bars/Reinforcing bar size(#) 4/#5 4/#5 4/#5 4/#5 Length of reinforcing steel(ft) 40.0' 40.0' 40.0' 40.0' Time drilling was completed(am/pm) 4:05pm 3:40pm 3:15pm 2:50pm Time concrete was placed(am/pm) 4:10pm 3:50pm 3:23pm 2:55pm Depth of pier from top of concrete(ft) 34.4' 32.4' 32.0' 32.7' Elevation:Top of pier (ft)** 95.0' 94.2' 94.2' 94.2' Elevation:Bottom pier (ft)* * 60.6' 61.8' 62.2' 61.5' Elevation:Top of bearing stratum(ft)* * 67.0' 68.3' 68.4' 68.0' Bearing stratum (Description) Unweathered dark gray shale NOTE: SEE REPORT # 116015 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. TIME: Note 1: ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 12:00 PM to 6:00 PM Due to delay in concrete delivery, and slight seepage of water from shaft sidew spoilage to approximately minus ten (10) feet below existing grade, after partial dr top of bearing stratum. Immediate placement of reinforcement steel and concrete fo pier location. Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced of the testing laboratory. The uae of our name must receive prior written al~proval of Maxim Technologies, Inc. L~ sample tested and/or inspected and are not indicative of the quantity of apparently identical or similar products. all, all piers backfilled with Iling (initial) to approximate ilowing the redrilling of each except in full without the approval tters and reports apply only to the