Loading...
Northlake 635(2)-LR 970425 (3)TECHNOLOGIES INC Ma CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX Perform Drilled Pier Inspection. PROJECT NO.: 09~ REPORT NO.: 115, DATE OF SERVICE: AUTHORIZATION: O] REPORT DATE: 4 REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived scheduled to perform a Drilled Pier Inspection. See atta; results of the inspection. Technician Time: 7:00 am - 4:30 Page I of 3 Technician: Rusty Bowers Technician Report Distribution: (1) Lincoln Property Co. (1) BUTt. ER CONSTRUCTION INCORP. (1) BROCKETT-DAVIS-ORAKE, INC. (1) THE CITY OF COPPELL (1) THE CITY OF COIN=ELL (1! O'BRIEN ASSOCIATES, INC. (1! A.E.C.C. 1099 FR Our letters ~ reports we f~ the excl~ve cms of the cfier~ to whom tt'm¥ ~e ~r~ ~ ~dl ~t ~ r~ full witho~ t~ approv~ of t~ t~;i~ I~at~. T~ ~ of ~ n~ m~ rec~ve ~ wri~en ap~ovd. O~ Rim Tech. ·Southwestem Labs 575 Lone Star Dr. · P.O. Box 224227 Dellu, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 3605034 ~90 4/17/97 ~going '25/97 on site as :hsd report for RNLABS :e~B~acken, B.S. Ch.E. 'roject Manager u~d eXCel=t in le'~m'a ~ rel~orm , ~mdm meducm. TECHNOLOGIES INC LINCOLN PROPERTY COMPANY Project N~:0903605034 Service Date:04/1?/9? 2575 Lone Star Ddve · P.O. Box 224227 · Dali; ~, Texa~ 75222 (214) 631-2700 · Fmc (214) 920-1;91 DRH~LF~D P~F~R INSPECTION (STRAXGHT SHA Report N~: 115490 Page 2 of 3 Date Drilled:4/17/97***OBSERVATION OF DRILLED FOUNDATION ~.ONSTRUCTION*** Pier identification D.6-1 E.3-1 E.9-1 G.3-1 Pier diameter(in) 24 24 24 24 Depth of pier from eurface(ft) 36.7 37.4 33.5 36.6 Depth of bearing stratum from surfece(ft) 30.4 31.2 27.0 30.3 Required penetration(ft) 6.0 6°0 6.0 6.0 Actual penetration(ft) * 6.3 6.2 6.5 6.3 Condition of bottom(wet/dry) DRY DRY DRY DRY Plumb within tolerance(yes/no) YES YES YES YES # of bars/Reinforcing bar size(#) 6/#6 6/#6 6/#6 6/#6 Length of reinforcing steel(ft) 36.3 36.7 33.0 36.1 Time drilling was completed(am/pm) 1 O: 13a 9:50a 11:02a 12:40p Time concrete was placed(am/pm) 10:25a 10:OOa 11:12e 12:51 p Depth of pier from top of concrete(ft) 36.8 37.2 33.5 36.6 Elevation: Surface(fO' ' 95.4 95.7 95.5 95.5 Elevation:Top of pier (ft)'' 95.5 95,5 95.5 95.5 Elevation:Bottom pier (ft)* ' 58.7 58.3 62.0 58.9 Elevation:Top of bearing stratum(ft)'' 65.0 64.5 68.5 65.2 Bearing stratum (Description) DARK GRAY UNWEATHERED SHALE NOTE: SEE REPORT # 115491 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. · ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ·' ELEVATION BY OTHERS TIME: 7.'00 A.M. TO 4:30 P.M. Our lattar~ and reports are for the exclusive u~e of the olbflt to whom they are ~lclrmed ~nd ihdl not be relxo aO~ovd of the te~ng laboratory. The use of ou~ r~me m~t rec~ve prior writt~ aOIXOVd of ~ Techmd~ only to the sami~B te~ted and/or in~l)~-ted and are not ind~c~Jv® of the quantity of q~l)arendy identicJd or -,in~l ~ exee~ in full without the i,, ~,~. L~ar, ,nd repurt~ apply IxoductL TICHNOLO(IIIS INC LINCOLN PROPERTY COMPANY Project N~:0903605034 Service Date:04/17/97 2575 Lone Star Ddve · P.O. Box 224227 (, Dalla ~, Taxe~ 75222 (214) 631-2700 ,) FLY (214) 920.-18:ll DRH.LI~ PIER INSPECTION (STRAIGHT SHAFT) Report N°: 115490 Page 3 of 3 Date Drilled:4/17/97***OBSERVATION OF DRILLEr) FOUNDATION ;ONSTRUCTION*** Pier identification G.9-1 H.6-1 H.4-1 Depth of pier from surface(fi) 37.3 40.0 38.5 Depth of bearing stratum from surface(fi) 31.2 32.3 Required penetration(fi) 6.0 6.0 6.0 Actual penetration(fi) * 6.1 6.1 6.2 Condition of bottom(wet/dry) DRY DRY DRY Plumb within tolerance(yes/no) YES YES YES # of bars/Reinforcing bar size(//) 6///6 6///6 6///6 Length of reinforcing steal(fi) 39.3 38.5 37.6 Time drilling wee completed(am/pm) 1:30p 2:33p 3:22p Time concrete was placed(am/pm) 2:20p 2:50p 3:40p Depth of pier from top of concrete(fi) 39.8 39.0 38.1 Elevation: Surface(fi)* * 95.5 99.0 98.4 Elevation:Top of pier (fi)" · 98.0 98.0 98.0 Elevation:Bottom pier (ft) · ° 58.2 59.0 59.9 Elevalion:Top of bearing stratum(fi)"" 64.3 65.1 ~ 66.1 Bearing stratum (Description) DARK GRAY UNWEATHEI~ED SHALE NOTE: SEE REPORT # 115491 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. TIME: ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ELEVATION BY OTHERS 7:00 A.M. TO 4:30 P.M. Our letter, and raq~xm are for the exclusive uee of the diant to whom they ere eddrmmed and ehdl no~ be rel~'Qck approvad of the te~ting laboca{or¥. The uee of our name muet receive prior written approval of Mm Techndogil only to the eample te~tad and/or impacted and are not indicative of the quantity of apparently idantiod or ~ ced except in full without the .. inc. Lsttorm and reports ~)piy