Loading...
Northlake 635(2)-LR 970425 (6)Maxi~ 257 TECHNOLOGIES IN¢ REPORT OF DRILLED PIER INSPECTION CUENT: Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL~ TX PROJECT NO.: 0903( REPORT NO.: 11512 DATE OF SERVICE: 4 AUTHORIZATION: Ong REPORT DATE: 4/2 SERVICES: Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived o scheduled to perform a Drilled Pier Inepection. See attach results of the inspection. Technician Time:7=00 am - 5:30 pm Page i of 3 Tech.., Southwestern Labs tone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 TMephone: (214! 631-2700 FAX: (214) 920-1891 ,05034 I09/97 3ing 5/9? site as Bd report for Technician: Rusty Bowers Technician Report Distribution: ' (~) un~. P~o~n~ co. M&XIM TFC 4_ e~OIJTMW~RN LABS (1) BUTLER CONSTRUCTION INCOI~. (1! BROCKET~'-OA~IS-ORA~E, INC. (1) ~E CI~ OF CO~ (1) ~E CI~ OF CO~ (1) O'BRI~ ~ATE~ INC. (~)~c.c. / ~acken, S.S. Ch.E. TIC#NOLOGiBS INC LINCOLN PROPERTY COMPANY Project N~:0903605034 Service Date:04/9/9? 2575 Lone Star Drive · P.O. Box 224227 · Dallas, T, (214) 631-2700 · F~x (214} 920-1891 DRII.I.ED PIER INSPECTION (STRAIGItT SItAFT) 75222 Report N": 115123 Page 2 of 3 Date Drilled:4/9/97***OBSERVATION OF DRILLED FOUNDATION CO~ ~'STRUCTION*** Pier identification G2 G3 G4 G5 Pier diameter(in} 24 24 24 24 Depth of pier from surface(fO 39.0 39.0 39.0 36.5 Depth of bearing stratum from surface{ft) 33.0 33.0 32.5 30.1 Required penetration(ft) 6.0 6.0 6.0 6.0 ~ctual penetration(ft} ' 6.0 6.0 6.5 6.4 Condition of bottom(wet/dw) 4" WATER DRY DRY 2" WATER Piumb within tolerance(yes/no) YES YES YES YES I of bars/Reinforcing bar size(l) 6116 6/#6 6116 6/16 Length of reinforcing steel(E) 38.0 38.0 38.0 35.5 Time drilling wac completed(am/pm) 10:05e 10:32a 1 :OOp 11:42p Time concrete wac p!ec_,~_(am/pm) 10:1 Sa 10:46a 1:20p 12:241) Depth of pier from top of ooncrete(ft} 38.5 38.5 38.5 36.0 Elevation: Surface(fO" * 99.5 99.5 99.5 99.5 Bevation:Top of pier (ft) · · 99.0 99.0 99.0 99.0 Elevation:Bottom pier (ft)° ' 60.5 60.5 60.5 63.0 Elevation:Top of bearing stratum(fO* · 66.5 66.5 67.0 69.4 _ne-_.Hng stratum (Description) DARK GRAY UNWEATHERED SHALE NOTE: SEE REPORT #116124 FOR COMPRESSIVE STRENGTH TEST SPECIMENG. · ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. · , ELEVATION BY OTHERS TIME: 7:00 A.M. TO 5:30 P.M. Our I~ter. and reports ~re for the exdueive use of the dient to whmn they ~re Iddre~NcI ~ .h~dl nGt be reprcxluc appcovd of the tearing I~oratmy. The u~e of our n~me must receive ~ written .pprcwd of Maxim Tec~noiog~ ordy to the sample te~tad andl~w ir~pe~ted and ~re mX indie, ative ct the qu.ntit¥ of a;~.rentty id~tlr~l o~ ~ r" TICHNOLOIIE$ iNC LINCOLN PROPERTY COMPANY Project N~:0903605034 Service Date:04/9/97 2575 Lone Stat Drive ', P.O. Box 224227 · Dallal, aXal 75222 (214} 631-2700 * Fmc (214) 920-1891 DRILLED PIER INSPECTION (STRAIGHT S~ Report N~: 115123 Page 3 of 3 Date Drilled:4/9/97***OBSERVATION OF D~ FOUNDATION COl qSTRUCTION*** Pier identification E2(J) G6 H2 H6 Pier diameter(in) 24 24 24 24 Depth of pier from surface(A) 37.9 36.1 38.2 37.3 Depth of bearing stratum from surface(ft} 31.7 30.1 32.0 30.7 Required penetration(A) 6.0 6.0 6.0 6.0 Actual penetration(ft)" 6.2 6.0 6.2 6.6 Condition of bottom(wet/dry) DRY 4" WATER DRY DRY Plumb within tolerance(yes/no) YES YES YES YES I of bars/Reinforcing bar size(I) 6/t6 6116 61t6 61t6 Length of reinforcing steel(ft) 33.4 35.1 37.2 36.3 Time drilling was completed(am/pm! 1:18p 2:1 lp 3~5p 3:44p Time concrete was placed(am/pm) 1:37p 2:55p 3:25p 4:06p Depth of pier from top of concrste(ft) 33.9 35.6 37.7 36.8 Elevation: Surface(ft)' * 99.5 99.5 99.5 99.5 Elevation:Top of pier (ft)' · 95.5 99.0 99.0 99.0 Elevation:Bottom pier (ft) · * 61.6 63.4 61.3 62.2 Elevation:Top of bearing stratum(ft)** 67.8 69.4 67.5 68.8 Bearing stratum (Description) DARK GRAY UNWEATHERED SHALE NOTE: GEE REPORT ~116124 FOR COMPRESSIVE STRENGTH TEST SPECIMENG. · ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. · · ELEVATION BY OTHERS TIME: 7:00 A.M. TO 5:30 P.M. Our lette~l and reportl ire for the excduliVe use of the c4ient to whom they ire iddrelled lncl lhal nat be rlprodu~ approval of the tilting laboratory. The ,, of our nen~ must reneive ixior written q;~'ovd of Mixim Tedmdogi~, oldy to the $~rnlde tested ~,'td/or inepected ind Ire not hlclicitive of the clumltJty of qc:N:)~rmldy id~ ar I~ ~',