Loading...
Northlake 635(2)-LR 970425 (7)Ma; 2~ TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PAGE I OF 4 PROJECT NO.: 090.' REPORT NO.: 1145 DATE OF SERVICE: AUTHORIZATION: Ch REPORT DATE: 4/ Test compressive strength specimens prepared in conjunct inspection. CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C-138 AIR CONTENT: ASTM C173 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE AGE SET NO. TESTED (daw) 1 1 4/04/97 7 i 2 4/04/97 7 1 3 4/25/97 28 1 4 4/25/97 28 PROJECT DATA MIX DESIGN NUMBER: 933 CLASS OF CONCRETE: 300 DATE OF PLACEMENT: 3/ TIME SAMPLED: 04:12~ TEMPERATURE (DegF) - AIR: TRUCK NO: 728 MEASURED SLUMP (in.): 5. AIR CONTENT(%): 3.25 LOCATION OF PLACEMENT: 5' from south curb at southwest corner REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE ' DIAMETER AREA LOAD STRENGTH (in.} (sq.in.) (lbs. force) {psi} F 6.00 28.27 95740 3390 C 6.00 28.27 96110 3400 C 6.00 28.27 113720 4020 C 6.00 28.27 121720 4300 C Technician: David King Technician Report Of Tests Continued On Page 2 :im Tech. ·Southweatem Labs i75 Lone Star Dr. · P.O. Box 224227 Della,, Taxa, 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 t605034 61 3/28/97 arlie 25/97 ion with concrete psi @ 28 days 28/97 BY: David King 58 CONCRETE: 69 TICKET NO: 343327 50 UNIT WEIGHT(pcf): N/A and 10' from east curb of building B RACTURE TYPE REMARKS Our letters etd report~ are for the exclusive u~e of the client to whom they are ad,re.ed and shall not be reprod~ :ed except in full without the approval of the t~ti~ laboratory. The ~e of our name must receive our wntten aoproYel. Our h ttera and reports 1001 LW apply only to the sample te~ted e~d/or inspected, end ere not indicative of the quantities of apparently identical or similar products. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 3/28/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont i hued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST SAMPLING: MOLDING & CURING: SLUMP: TEMPERATURE: AIR CONTENT: UNIT WEIGHT: CAPPING/PADS: TESTING: ASTM C-172 ASTM C31 ASTM C143 ASTM C-138 ASTM C173 N/A ASTM C617 ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 933' CLASS OF CONCRETE: 300~ DATE OF PLACEMENT: 3/: TIME SAMPLED: 05: 56AM TEMPERATURE (DegF) - AIR: TRUCK NO: 771 MEASURED SLUMP (in.}: 6. AIR CONTENT(%): 3.75 LOCATION OF PLACEMENT: 6' from west expant expantion joint, 65 of building B REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) (in.) (Iq.in.) (lbs. force) (psi) F 2 1 4/o4/97 7 2 2 4/04/97 7 2 3 4/25/97 28 2 4 4/25/97 28 6.00 28.27 93790 3320 C~ 6.00 28.27 94160 3330 C~ 6.00 28.27 121880 4310 Cl 6.00 28.27 122860 4350 C~ Technician: David King Technician Report Of Tests Continued On Page 3 REPORT NO. 114561 PAGE 2 OF 4 SET NO. 2 psi @ 28 days 8/97 BY: David King ~0 CONCRETE: 70 TICKET NO: 343339 !5 UNIT WEIGHT(pcf): N/A Lon joint, 8' from north west of southeast corner IACTURE TYPE REMARKS )NE )NE )NE )NE Our letters and ret~orts are for the exclusive uae of the client to whom they ~re addressed and shell not be reprodu =ed except in full without the e[0provel of the testin~ laboratory. The u~ of ou~ name muat receive, our written apPr0¥el. Our la Itsrs and reports 1001 LW apply on y to t~e simp e tested and/or in~cted. ~ ere not indicative of the quantlt es of apparently dent cai or limiler products. Lincoln Property Co. PROJECT NO. 0903605034 DATE OFSERVlCE: 3/28/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( Cont i nued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST SAMPLING: MOLDING & CURING: SLUMP: TEMPERATURE: AIR CONTENT: UNIT WEIGHT: CAPPING/PADS: TESTING: ASTM C-172 ASTM C31 ASTM C143 ASTM C-138 ASTM C173 N/A ASTM C617 ASTM C39 CYLINDER MARKED DATE $ ET N O. TESTED PROJECT DATA MIX DESIGN NUMBER: 933c~ CLASS OF CONCRETE: 300( DATE OF PLACEMENT: 3/2 TIME SAMPLED: 07 =45AM TEMPERATURE (DegF) - AIR: TRUCK NO: 739 MEASURED SLUMP (in.): 6 AIR CONTENT(",(,): 3 · 75 LOCATION OF PLACEMENT: 6' from north curb from west building REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) (in.) (sq.in.) (lbs. force) (psi) F 3 1 4/04/97 7 3 2 4/04/97 7 3 3 4/25/97 28 3 4 4/25/97 28 6.00 28.27 94190 3330 CC 6.00 28.27 93990 3320 CO 6.00 28.27 103420 3660 CO 6.00 28.27 116600 4120 CO Technician: David King Technician Report Of Tests Continued On Page 4 REPORT NO. 114561 PAGE 3 OF 4 SET NO. 3 psi @ 28 days 8/97 BY: David King I CONCRETE: 70 TICKET NO: 343349 0 UNIT WEIGHT(pcf): N/A ext to building and 56' orner on building C ACTURE TYPE REMARKS NE NE NE ~E Ou~ lette¢~ a~d reports are for the exclusive use of the client to whom they are eddre~ed end shill not be reer~u~ ~ ex,pt in full witho~ ~ approvN of t~ t~ti~ laboratory. T~ ~ of o~ name m~t recmve our written aDprovll. Our le~, ~ a~ repor~ 1001 LW aoply only to t~ sam~ie t~ted a~/or i~ct~, a~ are ~t i~icative of t~ quantiti~ of agparently identical or sil 1ilar pr~ucts. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 3/28/97 CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C-138 AIR CONTENT: ASTM C173 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cent i hued ) PROJECT DATA MIX DESIGN NUMBER: 933~. CLASS OF CONCRETE: 300( DATE OF PLACEMENT: 3/; TIME SAMPLED: 10: 30~v[ TEMPERATURE (DegF) - AIR: TRUCK NO: 771 MEASURED SLUMP (in.): 5. AIR CONTENT(%): 4.0 LOCATION OF PLACEMENT: 1' from the west, 1 at southwest corner REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) (in.) (sq.in.) (lbs. force) (psi} FR 4 1 4/04/97 7 6.00 28.27 93860 3320 CO 4 2 4/04/97 7 6.00 28.27 93910 3320 CO 4 3 4/25/97 28 6.00 28.27 126810 4480 CO 4 4 4/25/97 28 6.00 28.27 118440 4190 CO Technician: David King Technician Report Distribution: (1) Unce~ Prel~'ty Ce. (1) BUTLER CONS'T~UCT1ON INCORP. [1 ) BROCKETT-OAVIS.-DRAKE, INC. (1} THE CITY OF COLWELL (I! THE CITY OF COPPEU. (1! O'BRIEN ASSOCIATES, INC. (1 ! A.E.C.C. 1001 LW REPORT NO. 114561 PAGE 4 OF 4 SET NO. 4 psi @ 28 days 8/9? BY: David King 0 CONCRETE: 72 TICKET NO: 343368 5 UNIT WEIGHT(pcf): from the north of building C N/A ACTURE TYPE REMARKS .~E .~E Lawrence~Bracken, B.S. Ch.E. PrOject Manager .O? le~..er~ a~d. report~ a. re.for the exclusive u~e of the client to whom they sre eddre~ed ar~ shall net be reproduce¢~ except in TUll WithOUt tN approvM of the re, tirol laboratory. The u~e of ou~ name mLmt receive our wr tten approve. Our lettei's snd reports apply only to the sample te~ted and/or inspected, and ate not indicative of the Cluantitie~ of apparently identical or sin~ilsr products. |