Loading...
Northlake 635(2)-LR 970421 (4)Maxir 257 TECHNOLOGIES INC CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903E REPORT NO.: 114861 DATE OF SERVICE: 4 AUTHORIZATION: Ong~ REPORT DATE: 4/2 Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived o scheduled to perform a Drilled Pier Inspection. See attach results of the inspection. Technician Time: 7:00 am to 6:00 pm Page I of 3 Technician: Rusty Bowers Technician Report Distribution: 11 Unceln Progerty Co. MAXIM TFC [1) BUTLER CONSTRUCTION NCORP. {1] SROCKETT-DAVIS-ORAKE. INC. J (1) THE CITY OF COPPELL (1! THE CITY OF COPPELL (11 O'BRIEN ASSOCIATES, INC. {1! A.E.C.C. Our letter~ end reports ~e for the exclusive u~e of the client to whom they are ~ end she# not be slx u¢ full without the approval of the te~ting laboratory. The ~ of ou~ name mu~l: recmve our written el3provM. Out 1099 JS al3ply only to the simple te~torl and/or ir~13ectorl, and ire not indicative of the qu&-ltitie~ of clemently identicM or I Tach. Southwestern Labs Lone Star Dr. P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-27OO FAX: (214) 920-1891 )5034 3ing L/97 ~ site as ad report for N LABS /Bracken, B.S. eject Manager ad exce~ in [~rl Ind reDor~ imilor ~oducts. Ch. E. TICHNOLOelI! INC LINCOLN PROPERTY CO. Project N~:0903605034 Service Date:04/03/97 2575 Lone Star DHve · P.O. Box 224227 · Dalla~ (214) 631-2700 · Fax (214) 920-189 DRILLED PIER INSPECTION (STRAIGHT SHAFT) Texaa 75222 Report N=: 1 14868 Page 2 of 3 NOTE: SEE REPORT # 114869 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. · ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. · * ELEVATION 8Y OTHERS TIME: 7:00 A.M. TO 6:00 P.M. I.,1 ~1 Lfd L. I I I l i r~ U * ~.t 'l' l t.,l '.J I'~1 ,~,~ ~,~ v b . . . Pier identification E6(J) F2 F7 E4(J) F5 E5(J) F3 Pier diameter(in) 24 24 24 24 24 24 24 Depth of pier from surface(ft) 39.3 38.9 39.0 37.5 40.1 37.6 38.9 Depth bearing stratum from surface(ft) 32.6 32.0 33.0 31.5 34.1 31.4 32.7 Required penetration(ft) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Actual penetration(ft) · 6.7 6.9 6.0 6.0 6.0 6.2 6.2 Condition of bottom(wet/dry) Dry 4'Water 3"Water Dry Dry Dry Dry Plumb within tolerance(yes/no) Yes Yes Yes Yes Yes Yes Yes Casing diameter(in)/Length(ft) NA/NA NA/NA NA/NA NA/NA NA/NA NA/NA NA/NA # of bars/Reinforcing bar size(//) 61#6 6///6 6///6 61//6 6///6 61//6 6/#6 Length of reinforcing steel(ft) 34.8 37.9 38.0 33.0 39.1 33.1 37.9 Time drilling was completed(am/pm) 10:15A 10:48A 11:59A 12:30P 1:07P 2:32P 2:56P Time concrete was placed(am/pm) 10:3 lA 10:58A 1:00P 12:44P 1:20P 2:45P 3:10P Depth of pier from top of concrete(ft) 35.3 38.4 38.5 33.5 39.6 33.6 38.4 Elevation:Top of pier (ft)** 95.5 99.0 99.0 95.5 99.0 95.5 99.0 Elevation:Bottom pier (ft)** 60.2 60.6 60.5 62.0 59.4 61.9 60.6 Elevation:Top of bearing stratum(ft)** 66.9 67.5 66.5 68.0 65.4 68.1 66.8 Bearing s[tatum (Description) Dark Gray Unweathered Shale '03/97'** OBSERVATION OF DRILLED FOUNDATION CON ;TRUCTION*** TICHNOLOSIES LINCOLN PROPERTY CO. Project N=:0903605034 Service Date:04/03/97 2575 Lone Star Drive · P.O. Box 224227 · Dallas Texas 75222 (214} 631-2700 · Fax {214) 920-189 DRILLED PIER INSPECTION (STRAIGHT SHAFT) Report N=: 114868 Page 3 of 3 Date Drilled:O4/03/97***OBSERVATION OF DRILLED FOUNDATION ~TRUCTION*** Pier identification F6 F4 Pier diameter(in) 24 24 Depth of pier from surface(ft) 40.1 39.0 Depth bearing stratum from surface{ft) 34.0 33.0 Required penetration(ft) 6.0 6.0 Actual penetration(ft) ° 6.1 6.0 Condition of bottom(wet/dry) Dry Dry Plumb within tolerance(yes/no) Yes Yes Casing diameter(in)lLength(ft) NA/NA NAINA # of bars/Reinforcing bar size(#) 6/#6 6/#6 Length of reinforcing steel(ft) 39.1 38.0 Time drilling was completed(am/pm) 3:58P 4:20P Time concrete was placed(am/pm) 4:05P 4:30P Depth of pier from top of concrete(ft) 39.6 38.5 Elevation:Top of pier (ft)·· 99.0 99.0 Elevation:Bottom pier (ft)* · 59.4 60.5 Elevation:Top of bearing stratum(ft)° · 65.5 66.5 Bearing stratum {Description) Dark Gray Unweat red Shale NOTE: SEE REPORT # 114869 FOR COMPRESSIVE STRENGTH TEST SPECIMENS, · ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. · * ELEVATION BY OTHERS TIME: 7:00 A.M. TO 6:00 P.M.