Northlake 635(2)-LR 970411TECHNOLOGIES INC
CLIENT: Lincoln Property Co.
500 N. AKARD, SUITE 3300
ATTN: LARRY MOON
Dallas, TX 75201
PROJECT:
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
Maxi~
25;
REPORT OF
IN-PLACE DENSITY
PAGE 1 OF 1
PROJECT NO.: 0903
REPORT NO.: 1143E
DATE OF SERVICE: 3
AUTHORIZATION: Dan
REPORT DATE: 4/1
n Tech.- Southwestern Labs
5 Lone Star Dr. · P.O. Box 224227
Dallas, Texas 75222
Telephone: (214) 631-2700
FAX: (214) 920-1891
,05034
/24/97
[/97
TEST
NO
1.
2.
SERVICES: Perform in-place density and moisture content tests to de
of field compaction.
CONTRACTOR: BUTLER CONSTRUCTION
METHOD OF TEST:
DENSITY: ASTM D2922
MOISTURE: ASTM D3017
SPECIFICATION:
DENSITY: 95% Dry density
MOISTURE: -2 to+3 opt. moist
TEST OF: Building A select
fill
LOCATION
Retest of ~5 (3/24/97 am)
Retest of #6 (3/24/97 am)
:ermine the degree
PROJECT DATA
MATERIALS
112122 Reddish brown clayey
sand.
REPORT OF TESTS
FIELD OPTIMUM
MOISTURE MOISTURE
11.5 13.5
12.4 13.5
OP'
13.5
WET
123.0
127.0
ISTURE/DENSITY RELATIONS
'IMUM MAXIMUM
ISTURE % DENSITY pcf
115.0
)ENSITY MAXIMUM
:f) DENSITY DENSITY
DRY (Pcf) {% max)
109.3 115.0 95
111.6 115.0 97
Test results on this report meet project
specifications as noted above.
Technician: Rusty Bowers Started: 02: 30PM Stopped: 04: 00PM
Technician
Report Distribution:
~11 BUTLER CONSTRUCTION INCORP.
I1) BROCK~-DAVI~DRAKE, INC. / // / // //
{1) THE C~ OF COPPELL
(1) THE Cl~ OF COPPELL
~1) O'BRtEN ASSOCIATES, INC. / ~///~ ~ /
...' /~~celBracken, B.a. Ch.e.
, ~ ~ Pr~j act Manager
[UJJ without t~ aooroval 0f the testing laboratory. The use of our ~sm~