Loading...
Northlake 635(2)-LR 970411TECHNOLOGIES INC CLIENT: Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT: COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX Maxi~ 25; REPORT OF IN-PLACE DENSITY PAGE 1 OF 1 PROJECT NO.: 0903 REPORT NO.: 1143E DATE OF SERVICE: 3 AUTHORIZATION: Dan REPORT DATE: 4/1 n Tech.- Southwestern Labs 5 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 ,05034 /24/97 [/97 TEST NO 1. 2. SERVICES: Perform in-place density and moisture content tests to de of field compaction. CONTRACTOR: BUTLER CONSTRUCTION METHOD OF TEST: DENSITY: ASTM D2922 MOISTURE: ASTM D3017 SPECIFICATION: DENSITY: 95% Dry density MOISTURE: -2 to+3 opt. moist TEST OF: Building A select fill LOCATION Retest of ~5 (3/24/97 am) Retest of #6 (3/24/97 am) :ermine the degree PROJECT DATA MATERIALS 112122 Reddish brown clayey sand. REPORT OF TESTS FIELD OPTIMUM MOISTURE MOISTURE 11.5 13.5 12.4 13.5 OP' 13.5 WET 123.0 127.0 ISTURE/DENSITY RELATIONS 'IMUM MAXIMUM ISTURE % DENSITY pcf 115.0 )ENSITY MAXIMUM :f) DENSITY DENSITY DRY (Pcf) {% max) 109.3 115.0 95 111.6 115.0 97 Test results on this report meet project specifications as noted above. Technician: Rusty Bowers Started: 02: 30PM Stopped: 04: 00PM Technician Report Distribution: ~11 BUTLER CONSTRUCTION INCORP. I1) BROCK~-DAVI~DRAKE, INC. / // / // // {1) THE C~ OF COPPELL (1) THE Cl~ OF COPPELL ~1) O'BRtEN ASSOCIATES, INC. / ~///~ ~ / ...' /~~celBracken, B.a. Ch.e. , ~ ~ Pr~j act Manager [UJJ without t~ aooroval 0f the testing laboratory. The use of our ~sm~