Loading...
Northlake 635(2)-LR 970411 (3)TECHNOLOGIES INC MaxJ~ 25; CLIENT: PROJECT: SERVICES: REPORT OF DRILLED PIER INSPECTION Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 COPPELL BUSINESS CENTER WRANGLER DR. & BELTLINE RD. COPPELL, TX PROJECT NO.: 0903, REPORT NO.: 1146E DATE OF SERVICE: AUTHORIZATION: Che REPORT DATE: 4/] Perform Drilled Pier Inspection. REPORT OF INSPECTION On this date, a Maxim Technologies representative arrived c scheduled to perform a Drilled Pier Inspection. See attack results of the inspection. Technician Time: 7:00am to 5:30pm Page 1 of 2 Technician: Stewart Ainsworth Technician Report Distribution: (1) Lincoln ProperS, Co. (1) BUTLER CONSTRUCTION INCORP. I1) BROCKETT-DAVlS-DRAKE, INC. {1) THE CITY OF COPPELL I1) THE CITY OF COPPELL I1) O'BRIEN ASSOCIATES, iNC. {11 A.E.C.C. 1099 DY Tach. Southwestern Labs Lone Star Dr. P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: {214) 920-1891 505034 5 /31/97 rlie 1/97 n site as ed report for fun Wltmout the acorovat of ~ne testlnQ laOoraTorv, i r~ ~ u. ~u.. ,,.,,,~ ~ uantltles of &Parent[y identicai or~ m ar Droauc~s. apply only to ti~e sample t~l:ed anO/or !nspecte(:t, en~l ere not lnolcatlve of .h~ q p / TECHNOLOGIES IHC Lincoln Property Company Project :0903605034 Service Date: 03/31/97 2575 Lone Star Drive · P.O. Box 224227 · Dallas Texas 75222 (214) 631-2700 · Fax (214) 920-189 DRILLED pI'ER INSPECTION (STRAIGHT SHAFT) Report: 114685 Page 2 of 2 Date Drilled: 3/31/97***OBSERVATION OF DRILLED FOUNDATION 2ONSTRUCTION*** Pier identification HI8 Gl8 D/8 Fl8 B/7 CI8 BI6 Pier diameter(in)/Type 24 24 24 24 24 24 24 Depth of pier from surfece(ft) 37.4 35.6 36.0 36.0 34.0 37.0 34.5 Depth of bearing stratum from surface(ft) 31.4 29.5 30.0 30 28.0 31.0 28.3 Required penetration(ft) 6 6.0 6.0 6.0 6.0 6.0 6.0 Actual penetration(E) ' 6.1 6.1 6.0 6.0 6.0 6.0 6.2 Condition of bottom(wet/dry) wet (3") dry wet (4") wet (6") wet(3") dry dry Plumb within tolerance(yes/no) yes yes yes yes yes yes yes Casing diameter(in)/Length(ft) n/a n/a n/a n/a n/a n/a n/a # of bars/Reinforcing bar size(//) 6///6 6/#6 6///6 6///6 6/#6 6///6 6///6 Length of reinforcing steel(ft) 37 35 35.5 35.5 34.0 36.5 34.0 Time drilling was completed(am/pm) 12:00pm 11:50am 12:45pm 11:30am 1:55pm 2:50pm 3:05pm Time concrete was placed(am/pm) 12:1 Opm 12:00pm 1:05pm 11:35am 2:00pm 2:55pm 3:10pm Depth of pier from top of concrete(ft) 36.9 35.1 35.5 35.5 33.5 36.5 34.0 Elevation:Top of pier (ft)'* 99.0 99.0 99.0 99.0 99.0 99.0 99.0 Elevation:Bottom pier (ft)'' 62.1 63.9 63.5 63.5 65.5 62.5 65.0 Elevation:Top of bearing stratum(ft)'' 68.1 70.0 69.5 69.5 71.5 68.5 71.2 Bearing stratum (Description) Gray shale. NOTE: SEE REPORT # 114686 FOR COMPRESSIVE STRENGTH TEST SPECIMENS. * ADDITIONAL PENETRATION NOT REQUESTED UNLESS NOTED. ** ELEVATION BY OTHERS TIME: 7:00 A.M. TO 5:30 P.M. Our letters and reports a~e for the exclusive use of the client to whom they are addressed and shall not be reprod~sced except in full without the approval of the testing laboratory. The uso of our name must receive prior written approval of Maxim Technologi, m, Inc. Letters and reports apply only to the sample tested and/or inspected and are not indicative of the quantity of apparently identical or similar ~roducts.