Northlake 635(2)-LR 970404TECHNOLOGIES INC
CLIENT: Lincoln Property Co.
500 N. AKARD, SUITE 3300
ATTN: LARRY MOON
Dallas, TX 75201
PROJECT: COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
Maxin
REPORT OF
IN-PLACE DENSITY
PAGE 1 OF 1
PROJECT NO.: 09036
REPORT NO.: 11419(
DATE OF SERVICE:
AUTHORIZATION: Dan~
REPORT DATE: 4/0~
Tech.* Southwestern Labs
Lone Star Dr. · P.O. Box 224227
Dallas, Texas 75222
Telephone: (214) 631-2700
FAX: (214) 920-1891
05034
)
'21/97
~y
~/97
SERVICES: Perform in-place density and moisture content tests to del
of field compaction.
CONTRACTOR: BUTLER CONSTRUCTION
METHOD OF TEST:
DENSITY: ASTM D2922
MOISTURE: ASTM D3017
SPECIFICATION:
DENSITY: 95% Dry Density
MOISTURE: opt.
+3
TEST OF: Building "A" pad
PROJECT DATA
GAUGE:
GAUGE SERIAL NO.:
STANDARD COUNTS
MOISTURE - CURRENT:
DENSITY - CURRENT:
TEST MODE:
PROBE DEPTH (in.): 0
MATERIALS
112009 Red brown sand clay
TEST
NO LOCATION
REPORT OF TESTS
Retest on 3-20 Report
#114134.
Retest on 3/20 Report ~114134
MO
OP]
MO~
FIELD OPTIMUM FIELD
MOISTURE MOISTURE (p
(%) (%) WET
16.3 14.0 130.3
16.9 14.0 131.4
Test results on this report meet project
specifications as noted above.
ADDITIONAL COMMENTS:
Building "A" subgrade failed tests.
ermine the degree
PREVIOUS:
PREVIOUS:
STURE,/DENSITY RELATIONS
IMUM MAXIMUM
STURE % DENSITY pcf
,j ect Manager
)t be reproduced except in
3val. Obr letters and reports
identical or similar products.
Technician: Abdullah Ethem Started: 01:00PM Stopped: 03'00PM
Technician
Report Distribution:
!~ Lincoln Property CO.
BUTLER CONSTRUCTION INCORP. MAXI_M~-EC~
,'1! BROCKETT-DAVIS-ORAKE, INC.
? THE CI'f'Y OF COPPELL
THE CiTY OF COPPELL .
O'BRIEN ASSOC!ATES, INC. -
A.E.C.C.
fo w~hout the amcrcva of ~he testng aboratory ~he nse of ~r name mu~t ~ece~ve our wri~en aomr
~007 FR aOply on y to the ~ampie te~ted and/or ~ns~ecte~ and ~re no~ natcative of ~ne cuantJties of a~Darentl
l~racken, B.S. Ch.E.
)ENSITY MAXIMUM
DENSITY DENSITY
DRY (Pcf) (% max)
110.4 115.5 96
110.7 115.5 96
.4.0 115.5