North Texas Mail-LR 880328Maxim Engineers, Inc. 2342 Fabens
Geote(:;hnical P.O. Box 59902
Material~; Testing Dallas, Texas 75229
¢eonsultc'~ts (~14/247-7575
-Moisture/Density Relations of Soil
Test Prooedum
Method
Results
03/28/88 S. mCe D.~e 03/23/88
Explorer Pipe Line ~
Royal Lane Post Office Pipe Line Relocation
AFE ~2301-2340 - Coppell, T~xas
ASTM D 698
A
Preparation Procedure .................. Moist
Material Description ................... Yellowish brown silty
occasional dark gray
U~ified Soil Classification ............ CH
Material Origin ........................ fn-site utility tren¢
Liquid T.imit ........................... 53
Plastic l. dlMt .......................... 25
Plasticity Index 28
Percent Fassing No. 200 Sieve ........... 84
Maximun Dry Densit%, . ................... 92.0 lbs./cu, ft.
0ptJmum Moisture ....................... 27.0 percent
Technician:- G. McCoy
Dh/
Explorer Pipe Line Company - Roy Anderson
clay with'
,,layballs
I~im Englneer~, Inc.