Northlake 635(2)-LR 970403TECHNOLOGIES INC
Mm
2!
REPORT OF
IN-PLACE DENSITY
CLIENT: Lincoln Property Co.
500 N. AKARD, SUITE 3300
ATTN: LARR~ MOON
Dallas, TX 75201
PROJECT:
COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL, TX
PAGE I OF 1
PROJECT NO.: 1019:~
REPORT NO.:
DATE OF SERVICE:
AUTHORIZATION: Ch;
REPORT DATE: 4/(
SERVICES: Perform in-place density and moisture content tests to dE
of field compaction.
CONTRACTOR: BUTLER CONSTRUCTION
METHOD OF TEST:
DENSITY: ASTM D2922
MOISTURE: A~TM D3017
SPECIFICATION:
DENSITY: 95% Dry Density
MOISTURE: opt. to +3 moist
TEST OF: B. ui.lding s~u.bgrade
(select fill;
PROJECT DATA
MATERIALS
112209 Reddish brown sandy
clay
MC
OP
MC
TEST
NO LOCATION
120' S 120 E. of NW Building
corner, 1st lift.
120'S 60'E of N W building
corner 1st. lift.
REPORT OF TESTS
FIELD OPTIMUM FtEL~p~
MOISTURE MOISTURE
(%) {%) WET
21.5 * 14.0 129.9
20.0 * 14.0 129.5
An asterisk (*) appears next to test results wh
do NOT meet the project specifications as noted
Technician: Stewart Ainsworth Started: 03: 00PM Stopped: 06: 30PM
Technician
Report Distribution:
(1) Lincoln Prot~f Co
(1) BUTLER CONSTRUCT]ON )NCORP. U~
|1) BROCKETT-DAVlS-DRAKE. INC.
(1) THE CITY OF COPPELL
(1) THE CITY OF COPPELL / /
{1) O'BRIEN ASSOCIATES tNC
(1) A.E.C.C. ' '
Our lette~ and reoorta Me fo~ the exclU~ve use of the client to whom they a~e ecldre~med M~ sh~l net ~e re~'~xluced
:im Tech. · Southwestern labs
;75 Lone Star Dr. · P.O. Box 224227
Dalla~, Texa~ 75222
Telephone: (214) 631-2700
FAX: (214) 920-1891
605034
1/20/97
Lrlie
~3/97
~termine the degree
,ISTURE/DENSlTY RELATIONS
FIMUM MAXIMUM
.ISTURE % DENSITY pcf
14.0 115.5
)ENSITY MAXIMUM
:f) DENSITY DENSITY
DRY {Pcf) (% max)
105.8 1i5.5 92
106.7 115.5
Lch
)ove.
92
BS.
Ject Manager
iM ~oUuc~.