Loading...
Northlake 635(2)-LR 970404 (3)TECHNOLOGIES INC Max CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH Lincoln Property Co. 500 N. AKARD, SUITE 3300 ATTN: LARRY MOON Dallas, TX 75201 PROJECT NO.: 0902 REPORT NO.: 1145. COPPELL BUSINESS CENTER DATE OFSERVICE: . WRANGLER DR. & BELTLINE RD. AUTHORiZATiON:Ch. COPPELL, TX REPORT DATE: 4/I PAGE 1 OF 4 Test compressive strength specimens prepared in conjunct inspection. CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C-138 AIR CONTENT: ASTM C173 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED 1 1 4/04/97 1 2 4/04/97 1 3 4/25/97 PROJECT DATA MIX DESIGN NUMBER: 933' CLASS OF CONCRETE: 300~ DATE OF PLACEMENT: 3/ TIME SAMPLED: 04: 12AM TEMPERATURE (DegF) - AIR: TRUCK NO: 728 MEASURED SLUMP (in.): 5. AIR CONTENT(%): 3.25 LOCATION OF PLACEMENT: 5' from south curb at southwest corner REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH {days) {in.) (sq.in.~ {lbs. force) (psil F 7 6.00 28.27 95740 3390 C' 7 6.00 28.27 96110 3400 C~ 28 1 4 4/25/97 28 Technician: David King Technician Repor= Of Tests Continued On Page 2 im Tech. ·Southwestem Labs 75 Lone Star Dr, · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 605034 51 3/28/97 ~rlie )4/97 .on with concrete psi @ 28 days 8/97 BY: David King ;8 CONCRETE: 69 TICKET NO: 343327 50 UNIT WEIGHT(pcf): N/A ~nd 10' from east curb of building B ~ACTURE TYPE REMARKS )NE )NE Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 3/28/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont i nued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C-138 AIR CONTENT: ASTM C173 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 933! CLASS OF CONCRETE: 300~ DATE OF PLACEMENT: 3/; TIME SAMPLED: 05: 56AM TEMPERATURE (DegF) - AIR: TRUCK NO: 771 MEASURED SLUMP (in.): 6. AIR CONTENT(%): 3.75 LOCATION OF PLACEMENT: 6' from west expant expantion joint, 65 of building B REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH {days) {in.) (sq.in.) (lbs. force) {psi) F 2 1 4/04/97 7 2 2 4/04/97 7 2 3 4/25/97 28 6.00 28.27 93790 3320 C( 6.00 28.27 94160 3330 C( 2 4 4/25/97 28 Technician: David King Technician Report Of Tests Continued On Page 3 1001 LW Our letters end reports are for the exclusive use of the =tient to ~mom tme¥ are ~dressed a~ shall not ~e reprodu fu~l wi~hou[ t~ ao~rovel of the te~tlng laDorator~. The ~e of our ~ame must receive our written a~Droveh Our ~e REPORT NO. 114561 PAGE 2 OF 4 SET NO. 2 @ 28 days psi 8/97 BY: David King i0 CONCRETE: 70 TICKET NO: 343339 !5 UNIT WEIGHT(pcf): N/A .on joint, 8' from north west of southeast corner :ACTURE TYPE REMARKS ,NE )NE :ed except In ~ters amcl reports ~lmdaf products. Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 3/28/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont inued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C-138 AIR CONTENT: ASTM C173 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 933c. CLASS OF CONCRETE: 300( DATE OF PLACEMENT: 3/; TIME SAMPLED: 07: 45AM TEMPERATURE (DegFi - AIR: TRUCK NO: 739 MEASURED SLUMP (in.): 6. AIR CONTENT(%): 3.75 LOCATION OF PLACEMENT: 6' from north curb from west building REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) {in.) {sq.in.) (lbs. force) (psi) F 3 1 4/04/97 7 3 2 4/04/97 7 3 3 4/25/97 28 6.00 28.27 94190 3330 Cf 6.00 28.27 93990 33.20 Cf 3 4 4/25/97 28 Technician: David King Technician Report Of Tests Continued On Page 4 ~001 LW Our letters and reDorts are roi' the exclusive use of ~he client to wl3om they are ec~clressed a~ shall not be reoroduc REPORT NO. 114561 PAGE 3 OF 4 SET NO. 3 , psi @ 28 days 8/97 BY: David King 1 CONCRETE: 70 TICKET NO: 343349 ~0 UNIT WEIGHT(pcf): N/A ~ext to building and 56' ~orner on building C ;ACTURE TYPE REMARKS ,NE ~NE Lincoln Property Co. PROJECT NO. 0903605034 DATE OFSERVICE: 3/28/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cont i nued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 SLUMP: 5" METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C-138 AIR CONTENT: ASTM C173 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 DAYS AIR: 3-6% CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER:: 933~. CLASS OF CONCRETE: 300( DATE OF PLACEMENT: 3/; TIME SAMPLED: 3. OI: 30AM TEMPERATURE (DegFl - AIR: TRUCK NO: 771 MEASURED SLUMP (in.): 5. AIR CONTENT(%): 4.0 LOCATION OF PLACEMENT: 1' from the west, 1' at southwest corner REPORT OF TESTS CONCRETF COMPRESSIVE STRENGTH - 6 X 12 CYLINOERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) (in.) (sq.in.) (lbs. force) (psii) FI 4 1 4/04/97 4 2 4/04/97 4 3 4/25/97 7 6.00 28.27 93860 3320 C( 7 6.00 28.27 93910 3320 CC 28 4 4 4/25/97 28 Technician: David King Technician Report Distribution: (1J Lincoln Property Co. (II BUTLER CONSTRUCTION INCORP. (li 8ROCKETT-DAVIS-DRAKE,INC. (11 THE CITY OF COPPELL (11 THE CITY OF COPPELL tll O'BRIEN ASSOCIATES. iNC. (1) A.E.C.C. REPORT NO. 114561 PAGE 4 OF 4 SET NO. 4 psi @ 28 days 8/97 BY: David King 0 CONCRETE: 72 TICKET NO: 343368 '5 UNIT WEIGHT(pcf): N/A from the north of building C IACTURE TYPE REMARKS ~NE ~NE N LABS L-B-r~cken, B. S. Ch. E. 'oject Manager ed exceo! in