Loading...
Northlake 635(2)-LR 970401TECHNOLOGIES INC M~ CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH Lincoln Property Co. 500 N. AKARD, SUITE 3300 PAGE i OF 4 ATTN: LARRY MOON Dallas, TX 75201 PROJECT NOi.: 090~ REPORT NO.~ 1132 COPPELL BUSINESS CENTER DATE OFSE~VICE: WRANGLER DR. & BELTLINE RD. AUTHORIZATION: COPPELL, TX REPORT DA~E: 4 Test compressive strength specimens prepared in conjunc inspection. CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: ASTM C138 CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED . SET NO. 1 1 1 2 1 3 PROJECT DATA MIX DESIGN NUMBER: 933 CLASS OF CONCRETE: 30C DATE OF PLACEMENT: 3/ TIME SAMPLED: 09: 50A~I TEMPERATURE (DegF) - AIR: TRUCK NO: 100 MEASURED SLUMP (in.): 6. AIR CONTENT(%): 4.5 LOCATION OF PLACEMENT: 120' West of east e REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYUN~DERS MAXIMUM COMPRESSIVE DATE AGE DIAMETER AREA LOAD STRENGTH TESTED {days) (in.) (sq.in.) {Ibs. force) (p~i) 3/11/97 7 6.00 28.27 79100 2800 4/01/97 28 6.00 28.27 108300 3830 4/01/97 28 6.00 28.27 105450 3730 ADDITIONAL COMMENTS: Warned finishers about too much water being added. Technician: Phillip L. Forrest Technician Repor= Of Tests Continued On Page 2 1001 OY :im Tech. Southwestern Labs ~75 Lone Star Dr. P.O. Box 224227 Dallas, Texaa 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 1605034 45 3/04/97 01/97 ion with concrete 9 0 psi @ 28 days 04/97 BY: Phillip L. Forrest 58 CONCRETE: 66 TICKET NO: 342635 00 nd 15' south of north side. FRACTURE TYPE CONE CONE REMARKS Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 3/04/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: ASTM C138 CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET N'O. TESTED PROJECT DATA MIX DESIGN NUMBER: 93.! CLASS OF CONCRETE: 30C DATE OF PLACEMENt: 3/ TIME SAMPLED: 1[ = 15A~ TEMPERATURE (DegF) - AIR: TRUCK NO: 87 MEASURED SLUMP (!n.): 5. AIR CONTENT(%}: 6-2% LOCATION OF PLACEMENT: Building S. north ! building to 30' sou REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days} {in.) {sq.in.} (lbs. force} 2 I 3/11/97 7 2 2 4/01/97 28 2 3 4/01/97 28 6.00 28.27 108980 3850 6.00 28.27 125710 4450 C 6.00 28.27 123680 4370 C ADDITIONALCOMMENTS: 5 Gallons of water added at site. Technician: Phillip L. Forrest Technician Report Of Tests Continued On Page 3 1001 ;DY Our letters an~ reports are for the exclusive use of the cdent to wmom :hey '~re addressed amd shall not be reorO~t .REPORT NO. 113245 PAGE 2 OF 4 SET NO. 2 9 0 psi @ 28 days 04/97 BY: Phillip L. Forrest 75 CONCRETE: 72 TICKET NO: 342643 O0 /2 side, from west edge of th of north edge. FRACTURE TYPE REMARKS ONE ONE ced except in Lincoln Property Co. PROJECT NO. 0903605034 DATE OF SERVICE: 3/04/97 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: ASTM C138 CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA MIX DESIGN NUMBER: 933 CLASS OF CONCRETE: 300 DATE OF PLACEMENT: 3/ TIME SAMPLED: 02.' 40PM TEMPERATURE (DegF) - AIR: TRUCK NO: 736 MEASURED SLUMP (In.): 5 AIR CONTENT(%}: 4'8% LOCATION OF PLACEMENT: Eastside of bUildi: south end of buildi REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH {days} (in.) (sq.in,) (lbs. force) 3 i 3/11/97 7 3 2 4/01/97 2a 3 3 4/01/97 28 6.00 28.27 101710 3600 6.00 28.27 118420 4190 6.00 28.27 123320 4360 Technician: Phillip L. Forrest Technician Repor= Of Tests Continued On Page 4 1001 DY REPORT NO. 113245 PAGE 3 OF 4 SET NO. 3 9 0 psi @ 28 days 04/97 BY: Phillip L. Forrest 72 CONCRETE: 78 TICKET NO: 342663 75 g A west 1/2 100' north of ng. fRACTURE TYPE REMARKS )NE ONE Lincoln Property Co.. PROJECT NO. 0903605034 DATE OF SERVICE: 3/04/97 CONTRACTOR: BUTLER CONSTRUCTION CONCRETE SUPPLIER: PIONEER PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 5" AIR: 3-6% METHOD OF TEST SAMPLING: ASTM C-172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: ASTM C138 CAPPING/PADS: ASTM C617 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) PROJECT DATA MIX DESIGN NUMBER: 933 CLASS OF CONCRETE: 300 DATE OF PLACEMENT: 3/ TIME SAMPLED: 04:20PM TEMPERATURE (DegF) - AIR: TRUCK NO: 398 MEASURED SLUMP (in.): 5 AIR CONTENT(%): $. 0 LOCATION OF PLACEMENT: Parking east side o east of west edge 3 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH {days) {in.} {sq.in.) {lbs. force) {ps, i) F 4 1 3/11/97 7 4 2 4/01/97 28 4 3 4/01/97 28 Technician: Phillip L. Technician Report Distribution: (1} Lincoln Property Co. {1! BUTLER CONSTRUCTION INCORP. (1] BROCKETT-DAVIS-0RAKE, INC. (II THE CITY OF COPPELL (1} THE CITY OF COPPELL (1} O'BRIEN ASSOCIATES, iNC. (1l A.E.C.C. 1001 DY Forrest 6.00 28.27 107820 3810 6.00 28.27 120680 4270 C 6.00 28.27 126860 4490 C REPORT NO. 113245 PAGE 4 OF 4 SET NO. 4 psi @ 28 days 4/97 BY: Phillip L. Forrest 30 CONCRETE: 74 TICKET NO: 341578 5O building A west 1/2 -20· · south of screen wall. ACTURE TYPE REMARKS DNE DNE · ~e"~c~/~aCJi[en, B. $. Ch. E. /fi-- ~ ~ject Manager